Laserfiche WebLink
<br />~ <br /> <br />OLYMPIQUE <br /> <br />Fa~ade Access Consulting <br /> <br />..="'''''-~ <br />tNOJ..JS"in'f <br />!!l~..... <br /> <br />November 17, 2006 <br /> <br />Mario Ghizzi <br />City of Santa Ana <br />Building Maintenance Division <br />20 Civic Center Plaza, B-19 <br />Santa Ana, CA 92701 <br /> <br />RE: <br /> <br />OPOS Development Consulting Engagement <br />Project: Santa Ana City Hall <br />20 Civic Center Plaza <br />Santa Ana, CA 92701 <br /> <br />Project No. ODC-039-06 <br /> <br />Dear Mario: <br /> <br />Thank for you considering my firm to assist the City of Santa Ana with the above referenced Project As you know, <br />OL YMP/QUE is able to offer the City of Santa Ana high performance OPOS (Operating Procedures Outline Sheet) <br />Development Services and Project Management services for the Project's exterior building maintenance fa,ade <br />access code compliance, equipment and ongoing Scaffold Inspection and Testing requirements. The Operating <br />Procedures Outline Sheet (OPOS) will ensure owner compliance with the current Cal/OSHA regulation section <br />3282(p)(1)(c) that require building owners to provide their window cleaning contractors with an OPOS prior to <br />allowing them to use Bosuns Chair/CDA (Controlled Descent Apparatus) methods and/or counterweighted beams <br />as suspension points for their equipment An OPOS is also required when original equipment operating instructions <br />and manuals cannot be found on buildings with an existing window cleaning system (see section 3298 (a)(3-4)). <br /> <br />We are able to provide you with these professional services as a result of over 18 years of experience with exterior <br />building fal(ade access equipment Our professional affiliations and continued training wittJ the Scaffold Industry <br />Association (SIA) and International Window Cleaning Association (IWCAl also position OL YMPIQUE to deliver the <br />most up to date information on new technology and regulations for your project Additionally, our Cal/OSHA S.I.T. <br />Agency No. 36 status together with our intimate knowledge of the current Cal/OSHA Code governing both new <br />construction, existing building compliance, and renovation work allow us to efficiently develop and complete <br />projects free from future compliance liabilities. Costly facility operational hindrances that occur all too often as a <br />result of today's fast paced design and construction cycle can be eliminated through careful project management. <br />Access to Structural Engineering services and the latest material and equipment technologies through key vendors <br />carefully matched to specific projects is yet another benefit of hiring OL YMPIQUE. <br /> <br />Our PturesSibnillServices have been- carefully designed in stages; complete Willi milestone detiverabfes that ana' . <br />relative to key phases that are often required in roof-top system modernization as well as in the path to code <br />compliance. As a result, our clients are afforded the flexibility to be assisted with these key services over a timeline <br />that meets their budget These Professional Services are outlined in the following Project Initiation Proposal <br />complete for your review with the fees for each of the specific services. <br /> <br />San Diego Office <br />10439 RosefleStreel,SuiteC <br />San Diego, CA 92121 <br />(858) 643-1644 Fax (B5B) 225-0596 <br /> <br />Corporate Office <br />26232 ErllerpriseCourt <br />lakeFore5t, CAg,263(l.. <br />(949)45&-0796 Fax (949)455-0798 <br /> <br />WNW.facadeaccess.com <br /> <br />Los Angeles Office <br />Dispatch LOGiliion Only <br />Mailing Addless Coming Soon! <br />(323)604-079S Fax (323)297-2985 <br /> <br />Contraclo.-s U"ense No. 870719 <br /> <br />CaIIOSHAStTUc..ns... No. J6 <br /> <br />, <br />r~, <br />