My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25K - SA REGIONAL TRANSP CTR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
02/05/2007
>
25K - SA REGIONAL TRANSP CTR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:41:57 PM
Creation date
1/31/2007 9:28:38 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25K
Date
2/5/2007
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RTC Metrolink Extension Studies <br />February 5, 2007 <br />Page 2 of 3 <br /> <br />. Step one allocates up to a total of $3.4 million for cities to <br />develop a local transit vision and conduct initial planning. All <br />cities are eligible to receive $100,000 grants, once they execute a <br />cooperative agreement with aCTA. <br /> <br />. Step two is scheduled to commence in the first quarter of 2008 and <br />makes available the remainder of $30 million on a competitive basis <br />to further develop the most promising projects. <br /> <br />. Step three is planned to coincide with the availability of renewed <br />Measure M funds, proj ects may move into proj ect development and <br />implementation, and the major projects will presumably advance into <br />a federally funded preliminary engineering effort. <br /> <br />. Step four focuses resources on transforming the Metrolink stations <br />into major multi-modal transportation centers. <br /> <br />Parsons Brinckerhoff (PB) has been working with City staff and has <br />recently completed the Santa Ana Transit Master Plan (Exhibit 1). In <br />Step one of the Go Local Program PB will be studying in more detail the <br />transit feeder alignment concepts derived from the Transit Master Plan. <br />The four transit feeder service alignments currently under consideration <br />will connect the Santa Ana Regional Transportation Center (SARTC) with <br />the Civic Center and Downtown area, Main Place, Bowers Museum District <br />and the South Coast Metro Area. In addition options to extend this <br />service to the proposed Bus Rapid Transit (BRT) service along Harbor <br />Boulevard via the former Pacific Electric (PE) Right-of-way, 17th Street, <br />Bristol Street and Edinger Avenue, and the John Wayne Airport via <br />Sunflower Avenue, Bear Street and Interstate 405 will be considered. <br /> <br />Staff recommends that the City execute the cooperative agreement with <br />aCTA to receive an additional $100,000 to study the transit feeder <br />alignment concepts described above. Staff also recommends that the City <br />execute an amendment to the agreement with PB to provide consultant <br />support services to conduct the Metrolink extension studies that will <br />meet the various Federal transit agencies' guidelines. This will enable <br />Santa Ana to complete Step one of the Go Local Program and have a <br />project (s) ready for submittal for Step two which makes available $30 <br />million for further development of the most promising projects. <br /> <br />As stated previously, the additional $100,000 will be used for consultant <br />services to complete Step one of the Go Local program. The amended <br />contract is estimated at total contract amount not-to-exceed $254,000. <br /> <br />25K-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.