Laserfiche WebLink
<br />EMERSON A. FLINT <br />Director of Operations <br />As Director of Operations with Choate Pazking Consultants, Mr. Flint is responsible for <br />development of pazking facility projects as well as directing the technical staff in the <br />delineation efforts. Mr. Flint's extensive experience as a project architect of multilevel <br />pazking facilities and manager of the design process provides CPC with the design leadership <br />to meet an owner's needs <br />Experience: <br />Involved in the production of concept, design development and construction drawings for <br />parking facilities throughout Southern Califomia for the last decade. Developed extensive <br />knowledge of the specific project type including code analysis, plan review and permit <br />issuance procedures and construction issues. Previous employment experience includes five <br />yeazs at International Pazking Design and four yeazs at Walker Pazking Consultants. 1990- <br />1999. <br />Funes & Luege Architecture, Hawthorne, Califomia. Involved with the production of <br />working drawings and assured the compliance of building codes for different cities and <br />agencies. Responsible for the design and documentation of architectural details for <br />residential and commercial projects. Met with clients for the initial measuring and sketches <br />of existing structures. 1989-1990. <br />Frank Politeo & Associates, Long Beach, California. Diversified experience covering all <br />phases in the construction process of precast concrete stmctures and Type V buildings. <br />1984-1989 <br />Education: <br />Autonomus University of Guadalajaza 1977-1981 Guadalajaza, Jalisco, Mexico <br />Bachelor of Science in Architecture Degree <br />Selected Projects: <br />Garfield Entertainment Center, Alhambra, CA, 5 levels, 804 spaces, completed 2002 <br />First Street Parking Facility, Alhambra, CA, 5 levels, 250 spaces, completed 2001 <br />DPSS EI Monte, El Monte, CA, 6 levels, 834 spaces, completed 2000 <br />Experian, Costa Mesa, CA, 6 levels, 1380 spaces, completed 2002 <br />Howard Hughes, Los Angeles, CA, 8 levels, 1043 spaces, completed 2000 <br />Pasadena Corporate Center, Pasadena, CA, 4 levels, 453 spaces, completed 2002 <br />Pechanga, Indian Reservation P.F., Pechanga, CA, 3 levels, 1300 spaces <br />Ambassador City College, Pasadena, CA, 5 levels, 988 spaces <br />Sierra Madre Villa, Pasadena, CA, 5 levels, 961 spaces, in construction <br />1905 Main Street, Irvine, CA, 5 levels, 599 spaces, completed 2001 <br />Baxter Hyland, Los Angeles, CA, 5 levels, 599 spaces, completed 2000 <br />Johnson & Johnson Pharmaceutical Reseazch, San Diego, CA, 3 levels, 518 spaces <br />Saint Kilian's Church, Mission Viejo, CA, 1 level, 315 spaces, study <br />LA Unified School District, LA, CA, S parking facilities, awaiting DSA approval <br />*University of California, Santa Barbara, CA, 4 levels, 900 spaces, completed 1998 <br />*University of California, Irvine, CA, 2 P.F., 1050 & 1277 spaces completed 1992/93 <br />*Rita Avenue Parking Facility, Huntington Pazk, CA <br />*Civic Center Plaza Pazking Facility, Sacramento, CA <br />