My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
80A - JT PUBLIC HRG-320 WEST FOURTH
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
02/05/2007
>
80A - JT PUBLIC HRG-320 WEST FOURTH
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:42:06 PM
Creation date
1/31/2007 11:54:08 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
80A
Date
2/5/2007
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.. SNYDER <br />." LANGSTON <br /> <br />shoring, and foundation work. Additional monitoring may be required during key construction operations <br />as determined by the historical preservation architect retained by the owner, <br /> <br />The design and construction of the foundation system of the new structure must lake into account <br />the integrity of the adjacent existing structures. If it is found that the depth of the existing footings are <br />shallower than the new footings, design and construction procedures must be in place to fully support the <br />existing buildings during construction of the foundation system. Slot cutting, temporary shoring or other <br />methods must be employed to ensure that the structural systems of the adjacent buildings are not <br />compromised by construction of the new structure. Care must be taken to ensure that the movement of <br />the new building caused by wind or seismic events will not impact the existing adjacent structures. Tile <br />design of the new building should not degrade the performance of the existing structures during a wind or <br />seismic event; careful attention should be paid to isolating the new structure and the existing buildings. <br /> <br />Given the in-fill location of the new building care must be taken to keep the public and construction <br />personnel safe during construction activities. This may include the construction of a full pedestrian <br />barricade over the existing sidewalk and alley way, (if required), A logistical plan for deliveries and <br />hoisting of materials to the site must be deveioped taking into account the requirements of the adjoining <br />uses, and the requirements of City Officials. The logistical plan should include queuing location for <br />successive deliveries (concrete, steel, etc), temporary closing of the street and sidewalks for specific <br />installation, parking for construction personnel, scheduled utility Sllutclowns, el11ei'gency service <br />access, fire departlnent access, and installation of temporary standpipes. <br /> <br />If you have any further '1uest <br /> <br />e to contact me direct. <br /> <br /> <br />rc/lw <br /> <br />Creating Value Through Leadership in Real Estate and Construction <br /> <br />80A9!6~ <br /> <br />17962 Cowan, Irvine, California 92614 <br />Phone 949.863.9200 Fax 949.863.1087 <br />www.snvder.lanflslon.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.