Laserfiche WebLink
<br />~.-.......~. <br />________j <br /> <br />SUB-SECTION 1.1 <br /> <br />PROPOSED PREVENTATIVE MAINTENANCE SCHEDULE <br /> <br />Preventative. Maintenance will be inclusive of the following services; inspection, cleaning, <br />calibrating, testing and certification of the installed Security Electronic Systems at least twice a <br />year to ensure that the subject systems are fully operational and are functioning within the <br />manufactures recommended tolerances. <br /> <br />The following PMP Schedule, contains the following information ( elements: <br /> <br />COLUMN ONE: <br />COLUMN TWO: <br />COLUMN TWO: <br />COLUMN THREE: <br /> <br />SYSTEM TYPE <br />SYSTEM COMPONENT <br />FREQUENCY OF SERVICE <br />TYPE OF SERVICE <br /> <br />Based upon the acceptance of the PMP by the RFP Review Committee, facility specific PMP <br />schedules will be developeli along with a Master Schedule. These schedules will be based upon <br />the as-built conditions of the subject facility systems and will list the system types and <br />components that are installed at each facility. In association with the historical data that is <br />accessible through the computer based Trouble Reporting System, Preventative Maintenance <br />) will be conducted at the subject facilities in accordance to the Facility Specific Preventative <br />Maintenance Schedule. A Daily Preventative Maintenance Log will be coordinated and <br />maintained during all Preventative Maintenance activities. These logs will be maintained on site <br />at all times. Defects that are found during Preventative Maintenance, will be coordinated in a <br />manner that is identical to a Trouble Report and corrected accordingly. <br /> <br />In addition to the following PMP Schedule MASK Systems, Inc is also attaching an example of a <br />"Preventative Maintenance Log", to substantiate our ability to provide the subject services in a <br />professional and timely manner. <br /> <br />) <br />