My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - 1715 NORTH BRISTROL ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
03/05/2007
>
31A - 1715 NORTH BRISTROL ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:41:25 PM
Creation date
2/28/2007 12:21:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31A
Date
3/5/2007
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />10. Display, merchandise or signage located within a 12-foot radius area of <br />the building entrances must be kept to a maximum height three feet and <br />shall not block/obstruct any windows. <br /> <br />11 . The egress and ingress easement which runs across parcels facing <br />Seventeenth Street shall be preserved. <br /> <br />12. No structures shall be located within 107 feet of the northern property line. <br />This land shall be maintained as a parking and landscape buffer for the <br />duration of the project. <br /> <br />13. A decorative driveway approach to be installed on the Bristol and <br />Seventeenth Streets driveway entrances. <br /> <br />Mitiaation Measures <br /> <br />14. During construction, the contractor would be required to comply with <br />SCAQMD Fugitive Dust Rule 403 to suppress dust generated by <br />construction operations. To ensure compliance with SCAQMD Fugitive <br />Dust Rule 403, grading plans and demolition plans for the proposed <br />project shall reflect the following notes: <br /> <br />a. All material excavated or graded will be sufficiently watered to <br />prevent excessive amounts of dust. <br /> <br />b. All clearing and earthwork activities shall cease during period of <br />high winds (winds greater than 25 mph averaged over one hour) or <br />during Stage 1 or Stage 2 smog episodes. <br /> <br />c. Streets surrounding the project site shall be cleaned at the end of <br />each day of construction. <br /> <br />d. All material transported offsite shall either be sufficiently watered or <br />securely covered to prevent excessive amounts of dust. <br /> <br />e. The amount of area disturbed by clearing and earthwork activities <br />shall be minimized at all times. <br /> <br />f. Equipment engines shall be maintained in good condition and in <br />proper tune according to manufacturer's specifications. <br /> <br />g. To the extent feasible, gasoline powered equipment shall be used <br />for onsite and offsite construction activities. <br /> <br />15. Prior to the issuance of grading permits, the project developer shall <br />provide proof of coverage under NPDES General Construction Activity <br /> <br />31A-61 <br /> <br />Resolution No. 2007-14 <br />Page 11 of 14 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.