My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO HGWY SAFETY IMRPOVEMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
03/19/2007
>
55B - RESO HGWY SAFETY IMRPOVEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:41:03 PM
Creation date
3/14/2007 1:11:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
55B
Date
3/19/2007
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Resolution for HSIP <br />Grant Applications <br />March 19, 2007 <br />Page 3 <br /> <br />Highway Safety Improvement Program <br /> <br />Projects Recommended For Grant Application <br /> <br />FY 2007-2008 <br /> <br /> Location Improvement Cost <br />Harbor Blvd. and Kent Install new traffic <br /> Ave. signal $363,000 <br />Civic Center Drive and Install new traffic <br />Pacific Avenue signal $363,000 <br />Flower Street and Santa Install left turn arrows $300,000 <br /> Ana Blvd. <br />Flower Street and Install left turn arrows $300,000 <br />McFadden Avenue <br /> Citywide Overhead regulatory $220,000 <br /> signs <br /> Street name signs on <br /> Citywide arterials $297,000 <br /> Regulatory/Warning signs <br /> Citywide on arterials and $360,000 <br /> overhead <br /> Flower - Guardrail and Signage <br />Sunflower to MacArthur $400,000 <br /> Flower - Guardrail and Signage <br />MacArthur to Alton $300,000 <br /> Flower - Guardrail and Signage <br />Alton to Dyer $300,000 <br /> Flower - Guardrail and Signage <br />Dyer to Warner $400,000 <br /> Total $3,603,000 <br /> <br />EXHIBIT 1 <br /> <br />558-3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.