Laserfiche WebLink
<br />Chapter 4 Mitigation Monitoring and Reporting Program <br /> <br />Any concerns between monitors and construction petsonnel shall be addressed by tbe City of Sama Ana, <br />Planning Department. <br /> <br />4.4 <br /> <br />LIST OF MITIGATION MEASURES <br /> <br />As mentioned above, due to the prob'fam- and project-level components of this EIR, tbe MMP has been <br />divided into two parts to address each component separately. The mitigation measures that pertain to <br />implementation of the Overlay Zone and their method of implementation are listed in Table 4-1. The <br />mitigation measures, which include several mitigation measures from the prob'fam-level component, that <br />pertain to the First and Cabrillo Towers project are listed in Table 4-2. All project-specific mitigation <br />measures included in the Final EIR for this project would be monitored as described above. <br /> <br />The mitigation monitoring matrix on the following pages is formatted to parallel the format of the <br />Executive Summary table contained in the Final EIR. The matrix identifies the required mitigation <br />measures, the time frame for monitoring, and the responsible monitoring agencies. <br /> <br />It should be noted that the mitigation measures from Volume I that are contained within Table 4-2 have <br />been modified slightly so as to directly apply to the First and Cabrillo Towers project. The content and <br />action required by each mitigation measure have not been modified. <br /> <br />4-2 <br /> <br />City of Santa Ana <br /> <br />758-21 <br />