My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - 1901 E FIRST - METRO EAST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
03/19/2007
>
75B - 1901 E FIRST - METRO EAST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:41:15 PM
Creation date
3/14/2007 1:11:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
3/19/2007
Destruction Year
2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CHAPTER 2 <br /> <br />CEQA Findings <br /> <br />2.1 INTRODUCTION <br /> <br />This chapter presents the potential impacts that were identified in the EIR and the findings that are <br />required in accordance with Section 15091 of the CEQA Guidelines. The possible findings for each <br /> <br />significant and/ or potentially significant adverse impact are as follows: <br /> <br />(a) Changes or alterations have been required in, or incorporated into the project which avoid, <br />substantially lessen, or reduce the magnitude of the significant environmental effect as identified in <br />the EIR ("Finding 1"). <br /> <br />(b) Such changes or alterations are within the responsibility and jurisdiction of another public agency <br />and not the agency making the findings. Such changes have been adopted by such other agency or <br />can and should be adopted by such other agency. ("Finding 2") <br /> <br />(c) Specific economic, social, or other considerations make infeasible the mitigation measures or <br />project alternatives in the EIR ("Finding 3"). <br /> <br />Table 2-1 (CEQA Findings for the Metro East Mixed Use Overlay Zone (program-Level Component)) <br />and Table 2-2 (CEQA Findings for the First and Cabrillo Towers (project-Level Component)) <br />summarize the significant unavoidable impacts of Volumes I and II of the EIR, respectively, as currendy <br />proposed for certification and adoption of the proposed project. <br /> <br />Additional facts that support the findings are set forth in the Draft EIR, the Final EIR, the staff reports <br />to the Planning Commission and City Council, and the record of proceedings. <br /> <br />Metro East Mixed Use Overlay Zone EIR Findings of Fact/Statement of Overriding Considerations <br /> <br />2-1 <br /> <br />758-61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.