My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - 1901 E FIRST - METRO EAST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
03/19/2007
>
75B - 1901 E FIRST - METRO EAST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:41:15 PM
Creation date
3/14/2007 1:11:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
3/19/2007
Destruction Year
2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Chapter 4 Statement of Overriding Considerations <br /> <br />Impact 4.2-5 <br /> <br />Impact 4.2-6 <br /> <br />Operation of the proposed project would exceed South Coast Air Quality <br />Management District standards for VOC, NOx, CO, and PMw and would result <br />in a projected air quality violation. <br /> <br />Construction and operation of the proposed project could result in a cumulatively <br />considerable net increase of criteria pollutants for which the proposed project <br />region is in nonattainment under an applicable federal or state ambient air quality <br />standard. <br /> <br />Cumulatively, the proposed project would also have significant and unavoidable impacts with regards to <br />the above-mentioned impacts. <br /> <br />Noise <br /> <br />Impact 4.9-6 <br /> <br />Impact 4.9-7 <br /> <br />Construction activities associated with the proposed project could generate or <br />expose persons or structures to excessive groundbome vibration. <br /> <br />Operation of the proposed project would generate increased local traffic volumes <br />that would cause a substantial permanent increase in ambient noise levels in the <br />project vicinity. <br /> <br />Cumulatively, the proposed project would also have significant and unavoidable impacts with <br />regards to the above-mentioned impacts. <br /> <br />Transportation <br /> <br />Impact 4.12-7 <br /> <br />Impact 4.12-8 <br /> <br />Implementation of the proposed project would cause an increase in traffic which <br />is substantial in relation to the existing traffic load and capacity of the street <br />system. <br /> <br />Implementation of the proposed project would exceed standards established by <br />the Orange County Transportation Authority within the study area. <br /> <br />Cumulatively, the proposed project would also have a significant and unavoidable impact with regards to <br />the above-mentioned impact. <br /> <br />. Short-Term Impacts <br /> <br />Of the seven significant unavoidable impacts direcdy attributable to the proposed project and associated <br />cumulative impacts, as identified above, none would be classified as short-term. Because this document is <br />programmatic in nature and would be used to guide future development and subsequent environmental <br />analysis within the City, potential short-term impacts will be analyzed during specific projects CEQA <br />reVIew. <br /> <br />. Lon~Termlmpacts <br /> <br />Of the seven significant unavoidable impacts direcdy attributable to the proposed project and associated <br />cumulative impacts, as identified above, all of the aforementioned impacts are considered long-term. <br /> <br />4-2 <br /> <br />Metro East Mixed Use Overlay Zone EIR Findings of Fact/Statement of Overriding Considerations <br /> <br />758-78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.