My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC-POWERTEC 1
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
C (INACTIVE)
>
CC-POWERTEC 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:08:58 PM
Creation date
3/21/2007 12:08:10 PM
Metadata
Fields
Template:
Contracts
Company Name
CC-POWERTEC
Contract #
N-2007-012
Agency
Public Works
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT A <br /> <br />CC-POWERTEC <br />31441 Santa Margarita Parkway, A390 <br />Rancho Santa Margarita, Ca. 92688 <br />(949) 702-2434, (949) 858-8587 Fax <br /> <br />January 18, 2007 <br /> <br />CITY OF SANTA ANA <br />PUBLIC WORKS MAINT., M-8 <br />CORP. YARD / BLDG A <br />220 S. Daisy, Ca. 92703 <br /> <br />ATTENTION: NABIL SABA <br /> <br />REFERENCE: PROPOSAL FOR ENGINEERING SERVICES, PLAN/SPECIFICATION REVIEW, AND <br />ASSISTANCE IN PREPARATION FOR VARIOUS WATER PROJECTS. <br /> <br />Mr. Saba; <br /> <br />As requested, following is our proposal to provide general plan and specification review for upcoming <br />water projects in an effort to coordinate citywide water strategy taking into account the completed projects <br />and desired enhancements for new projects. It is recognized that our work on previous projects has <br />conformed to the standards of the City of Santa Ana while providing a complete and comprehensive <br />control strategy. Our effort is in cooperation with your department as part of an overall team that provides <br />the City of Santa Ana with excellence in engineering, product selection, and citywide planning in the <br />delivery of water services to its customers. <br /> <br />INCLUDED: <br /> <br />1. Conduct principle of operation study of existing conditions and make recommendations for changes. <br />The study will describe how the modified pump station or well site will be operated to cover the entire <br />range of pumping operations. <br /> <br />2. Assist in the review and preparation of plans and specifications by your staff including outside third- <br />party engineering firm(s). <br /> <br />3. Regular planned meetings with your staff to coordinate and execute a final plan toward bid <br />documents. <br /> <br />4. Major components to include Switchgear, MCC's, PLC's, VFD's, Solid-State-Starters, Main Control <br />Panels, power distribution, and field instrumentation requirements. <br /> <br />5. Assist In physical layout of equipment to optimize operational control and minimize space <br />requirements. <br /> <br />6. These services are provided at the billable rate of: <br /> <br />o THE ABOVE SERVICES ARE TO PROVIDED AT THE RATE OF $82.00/HR. <br />o NOT TO EXCEED A MAXIMUM AMOUNT OF $25.000.00 <br /> <br />NOT INCLUDED: <br /> <br />The City of Santa Ana will compile and provide for review a set of final as-built drawings, equipment <br />submittals, and sequence of operations of respective pump stations. Any blueprint charges to make <br />copies available to us are not included. <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.