Laserfiche WebLink
<br />3. Write specification including: <br />. UPS <br /> <br />. Batteries <br /> <br />. Networking capability and software <br /> <br />4. Prepare design, drawing and specification review limitations witb City of Santa Ana: <br />. Initial Study design meetings witb the City of Santa Ana. . .. . . . ... . .. ... . .. . .limit of (3) meetings <br />. Drawing and specification review meetings witb tbe City of Santa Ana.. . ..limit of (3) meetings <br />5. Insurance coverage to include: <br />. Professional liability "errors and omissions" liability - $1,000,000 <br /> <br />NOT INCLUDED: <br /> <br />1. Submittal drawing review process of successful bidder. <br />2. Civil Engineering structural changes (by otbers). <br />3. Mechanical engineering, including HVAC requirements. <br />4. Any planning for demolition or removal of asbestos or equipment containing or using asbestos. <br /> <br />ALL FOR THE NET SUM OF: <br />SIX THOUSAND DOLLARS & NO CENTS <br /> <br />$6.000.00 <br /> <br />Payment terms: <br />Regards, <br />/' <br /> <br /> <br />~ <br /> <br />Net 30-days. <br /> <br />/I' <br />,j/ <br />y <br />~a//t~4:oa- <br /> <br />Craig Lamascus, P.E. <br />Harold Wells Associates <br /> <br />Santa Ana ProposaC UPS <br /> <br />2 of 2 <br /> <br />12/19/06 <br /> <br />- <br />