Laserfiche WebLink
<br />Area Management Plan (DAMP) and the City of Santa Ana Local <br />Implementation Plan (LIP). <br /> <br />11 . Revise the site plan to incorporate construction of any proposed <br />"Treatment Control" BMP's using the Best Available Technology (such as <br />biofilters, dry or wet detention basins, landscape detentions, wet ponds or <br />wetlands, drainage inserts, filtration basins, etc.) and recommended sizing <br />calculations near the pollutant source, so as to infiltrate and filter the <br />pollutants of concern in post development run-off flow prior to its discharge <br />into any receiving body of water. Reference the Orange County Drainage <br />Area Management Plan (DAMP) and the City of Santa Ana Local <br />Implementation Plan (LIP). <br /> <br />12. Revise the site plan/tentative map to depict and note the construction of a <br />concrete bus pad on First Street at the existing bus stop. <br /> <br />13. Revise the site plan/tentative map to depict and note the installation of 36 <br />inch box street trees. <br /> <br />14. Revise the site plan/tentative map to depict and note the reconstruction of <br />full depth asphalt concrete on Cabrillo Park Drive to the street centerline <br />along the entire project frontage. <br /> <br />15. Revise the site plan/tentative map to note the construction of all public <br />improvements and to dedicate the right-of-way necessary to meet the <br />Metro East Public Realm Amenity Plan. <br /> <br />Resolution No. 2007-028 <br />Page 25 of 25 <br />