My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
22D - UNINTERRUPTIBLE POWER SOURCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
04/02/2007
>
22D - UNINTERRUPTIBLE POWER SOURCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:40:43 PM
Creation date
3/28/2007 11:30:18 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
22D
Date
4/2/2007
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY Co'UNCIL MEETING DATE: <br /> <br /> <br />REQUEST FOR <br />COUNCIL ACTION <br /> <br />CLERK OF COUNCIL USE ONLY: <br /> <br />APRIL 2, 2007 <br />TITLE: <br /> <br />CONTRACT AWARD FOR <br />UNINTERRUPTIBLE POWER SOURCE <br />BATTERIES <br />(SPEC. NO. 07-026) <br /> <br />APPROVED <br /> <br />o As Recommended <br />o As Amended <br />o Ordinance on 1 sl Reading <br />o Ordinance on 2nd Reading <br />o Implementing Resolution <br />o Set Public Hearing For <br /> <br />Cf <br /> <br />{2,Pu'Jt2.-- <br /> <br />, CITY MANAGER <br /> <br />CONTINUED TO <br /> <br />FILE NUMBER <br /> <br />RECOMMENDED ACTION <br /> <br />Award a contract to MGE UPS Systems, Inc., for uninterruptible power source <br />batteries in an amount not to exceed $45,672. <br /> <br />DISCUSSION <br /> <br />The City ensures that critical facilities and operations are provided a <br />power ,source back up in case of an emergency. The Santa Ana Police <br />Department and Holding Facility are equipped with back up power generators <br />in the event of a power outage. Additionally, the uninterruptible power <br />source (UPS) batteries are maintained to bridge from the main power to the <br />back up power generators to insure that the power supply is not <br />interrupted. <br /> <br />There are four areas equipped with the UPS batteries: the 9-1-1 dispatch <br />center, the j ail electronic security system, and the computer rooms for <br />both the police administration building and the holding facility. Although <br />still functional, the existing UPS batteries installed in 2001 have reached <br />their recommended lifespan. The contract will provide for the removal and <br />replacement of 192 batteries and connection cables. <br /> <br />6 Invitations For Bid mailed <br />1 Invitation For Bid mailed to a Santa Ana vendor <br />5 Bids received <br />1 Bid received from a Santa Ana vendor <br /> <br />Bids were received, opened on March 7, 2007 and evaluated (Exhibit 1). The <br />bid received from MGE UPS Systems, Inc., is responsive to the specification <br />and meets the City's requirements. <br /> <br />220-1 <br /> <br />'II <br />
The URL can be used to link to this page
Your browser does not support the video tag.