Laserfiche WebLink
<br />EXHIBIT C <br /> <br />Additional Offsite Mitigation Measures <br /> <br />Improvement <br /> <br />Location <br /> <br />Pay fair share of all costs to acquire required <br />right of way for and construct eastbound right <br />turn lane <br /> <br />Fourth Street at Southbound SR-55 on-ramp <br />(Tustin Avenue to SR-55) <br /> <br />In order to implement & satisfy mitigation <br />measure MM 4.12 2, construct raised "pork- <br />chop" island to Public Works Agency <br />specifications <br /> <br />First Street and Cabrillo along the project <br />frontage <br /> <br />Note: For offsite public improvements constructed by Owner (i.e., "pork-chop" island), it shall <br />pay all workers employed in connection with the work not less than the prevailing rates of <br />wages, as provided in the statutes applicable to public works contracts, including without <br />limitation SS 1770-1780 of the California Labor Code. <br /> <br />Ordinance No. NS-2741 <br />Page 28 of 28 <br /> <br />- 24- <br />