My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Appropriation Adjustment Recognizing Measure M2 Grant Funding for Dyer Road
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
04/01/2025
>
Item 12 - Appropriation Adjustment Recognizing Measure M2 Grant Funding for Dyer Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2025 9:23:52 AM
Creation date
3/26/2025 9:07:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
12
Date
4/1/2025
Destruction Year
p
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dyer Road Improvements Project <br />April 1, 2025 <br />Page 2 <br />4 <br />8 <br />8 <br />7 <br />an additional through lane in each direction to address the bottleneck that occurs near <br />the 55 freeway’s off and on ramps and incorporate a class II bike lane, wider sidewalks, <br />and landscaping (Exhibit 2). <br />On May 13, 2024, the OCTA Board of Directors approved a grant of $2,365,200 to the <br />City of Santa Ana for the engineering phase of the Project (Exhibit 3). The City is <br />required to provide a 25% matching contribution of $788,400 for the Project for a total of <br />$3,153,600. These funds will be used for the design phase and any remaining funds, <br />pending approval from the granting agency, will be allocated to future right of way and <br />construction phases. The City will seek additional Measure M2 grants in the coming <br />years for the right of way and construction phases of the Project. The City’s 25% share <br />will be sourced from current and future local funding, including but not limited to: <br />Transportation Systems Improvement Area (TSIA) funds, Gas Tax funds, and Measure <br />M2 Fairshare funds, and will be included in the FY 2025-26 Capital Improvement <br />Program (CIP) budget. <br />Staff recommends adding the awarded grant funds to the Dyer Road Improvements <br />(State Route 55 – 700’ East of Pullman Street) Project for the Design Engineering <br />Phase and amending the Fiscal Year 2024-25 Capital Improvement Program to include <br />the awarded grant funds (Exhibit 4). <br />ENVIRONMENTAL IMPACT <br />There is no environmental impact associated with the action. <br />FISCAL IMPACT <br />Approval of the requested appropriation adjustment will recognize $2,365,200 Fiscal <br />Year 2024-25 Measure M2 grant funds into the Public Works Measure M-Street <br />Construction, M2 Competitive revenue account (No. 03217002-52332) and appropriate <br />the same amount into the Public Works Measure M2 Competitive Street, Improvements <br />Other Than Building expenditure account (No. 03217663-66220). The City will <br />recognize the required City local match through future Council action during the FY <br />2025-26 CIP budget programing cycle. <br />The following table summarizes the funds budgeted and available in current FY 2024-25 <br />for design engineering and construction expenditures after the appropriation <br />adjustment. Any unspent budget in FY 2024-25 will be included in future-year <br />carryforwards for City Council consideration.
The URL can be used to link to this page
Your browser does not support the video tag.