My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Agreement for Pavement Managment Program Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
04/01/2025
>
Item 19 - Agreement for Pavement Managment Program Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 4:37:21 PM
Creation date
3/26/2025 2:22:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19
Date
4/1/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o' CTA &GO Countywide Pavement Management Plan Guidelines <br />Local Tax Dollars at Work <br />I. Pavement Management Plan Certification <br />The City/County of Type Here certifies that it has a Pavement Management Plan in conformance with <br />the criteria stated in the Orange County Transportation Authority Ordinance No. 3. This ordinance <br />requires that a Pavement Management Plan be in place and maintained to qualify for allocation of <br />revenues generated from renewed Measure M2. <br />The plan was developed by Type here* using Type here, a pavement management system, conforming <br />to American Society of Testing and Materials (ASTM) Standard D6433, and contains, at a minimum, the <br />following elements: <br />• Inventory of MPAH and local routes reviewed and updated biennially. The last update of the <br />inventory was completed on Month, Year for Arterial (MPAH) streets and Month, Year for local <br />streets. <br />• Assessment of pavement condition for all routes in the system, updated biennially. The last field <br />review of pavement condition was completed on Month, Year. <br />• Percentage of all sections of pavement needing: <br />o Preventative Maintenance: Type here% <br />o Rehabilitation: Type here% <br />o Reconstruction: Type here% <br />• Budget needs for Preventative Maintenance, Rehabilitation, and/or Reconstruction of deficient <br />sections of pavement for: <br />o Current biennial period $Type here <br />o Following biennial period $Type here <br />• Funds budgeted or available for Preventative Maintenance, Rehabilitation, and/or <br />Reconstruction: <br />o Current biennial period $Type here <br />o Following biennial period $Type here <br />• Backlog by year of unfunded pavement rehabilitation, restoration, and reconstruction needs. <br />• The Pavement Management Plan is consistent with countywide pavement condition <br />assessment standards as described in the OCTA Countywide Pavement Management Plan <br />Guidelines adopted by the OCTA Board of Directors. <br />*An electronic copy of the Pavement Management Plan (with Micro Paver or StreetSaver compatible <br />files) has been, or will be, submitted with the certification statement. <br />A copy of this certification is being provided to the Orange County Transportation Authority. <br />Submitted by: <br />Click here to enter text. <br />Name (Print) <br />Signed <br />Click here to enter text. <br />Title (Public Works Director and/or City <br />Engineer) <br />Click here to enter text. <br />Jurisdiction <br />Click here to enter a date. <br />Date <br />Effective March 2024 A-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.