My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - 1044 EAST FOURTH
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
04/16/2007
>
31A - 1044 EAST FOURTH
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:40:26 PM
Creation date
4/11/2007 12:39:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31A
Date
4/16/2007
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2. STORE CHARACTERISTICS <br /> <br />This section of the report describes the characteristics of the two Contractors' Warehouse stores in <br />the Los Angeles area that were analyzed in this parking study. <br /> <br />Study Stores <br /> <br />There are nine Contractors' Warehouse stores in Southern California. Home Depot staff selected <br />two locations for inclusion in this parking study: the store in Montebello, California, and the store in <br />Pomona, California. These two stores were selected to be representative of the average customer <br />and parking activity forthe nine stores. The Montebello store has about 75,600 square feet of space <br />and the Pomona store has 65,800 square feet. Table 1 summarizes the characteristics of each store. <br /> <br />Table 1 - Summary of Study Store haractenstIcs <br />Characteristic Montebello Store Pomona Store <br />I\ddress 7601 Telegraph Road 1680 W, Mission Blvd. <br />Montebello, CA 90640 Pomona. CA 91766 <br />Store Number 703 705 <br />Store Size 75,618 sq.ft, 65,367 sq. ft. <br />Total Transactions in 2004 216,311 209,521 <br />f\verage Daily Transactions in 2004 599 580 <br />Busiest Month in 2004 October October <br />Busiest Day of the Week in 2004 Saturday Saturday <br />f\verage Saturday Transactions in 2004 683 727 <br />Transactions on Busiest Day in 2004 879 881 <br />Busiest Day in 2004 Saturday, October 23 Saturday, October 16 <br />"' Busiest Day in 2004 Thursday, November 11 Saturday, October 23 <br />3" Busiest Day in 2004 Friday, November 26 Saturday, November 6 <br />Ih Busiest Day in 2004 Saturday, November 6 Saturday, May 22 <br />51h Busiest Day in 2004 Saturday, January 3 Saturday, May 29 <br />Parking Spaces Available on Study Day 113 163 <br />~tudy Day Saturday, October 1, 2005 Saturday, October 8, 2005 <br /> <br />c <br /> <br />Design Day <br /> <br />The "design day" refers to the day of the year that experiences the maximum level of parking <br />activity that can be accommodated by the parking lot that will be built as a result of the design <br />methodology. Rather than a specific date ofthe year, the design day is defined by how much parking <br />activity takes place. In other words, the goal is to provide just enough parking spaces to <br />accommodate the demand on the selected design day, which could be the busiest day of the year, the <br />51h busiest day, the I Olh busiest day, etc., which could occur in different months for different stores. <br /> <br />Parking Study a/Two Contractors Warehouse Stores - Final Report <br /> <br />Page 3 <br /> <br />A-Il <br /> <br />31 A-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.