My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HONDO COMPANY INC. 4
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
G-H (INACTIVE)
>
HONDO COMPANY INC. 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2015 9:02:00 AM
Creation date
4/24/2007 3:40:51 PM
Metadata
Fields
Template:
Contracts
Company Name
HONDO COMPANY INC.
Contract #
N-2007-016
Agency
COMMUNITY DEVELOPMENT
Expiration Date
12/31/2007
Insurance Exp Date
6/1/2007
Destruction Year
2010
Notes
Amended by N-2007-016-01
Document Relationships
HONDO COMPANY INC. 4A
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\G-H (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Engineering Contractors <br />2121 South Lyon Street <br />Santa Ana, CA 92705 <br /> <br />714J434.{l! 04 <br />FAX 714/434.{l21 5 <br /> <br />March 29,2007 <br /> <br />Carolyn Fullerton <br />The Depot at Santa Ana <br />1000 East Santa Ana Blvd. <br />Santa Ana, CA 92705 <br /> <br />Dear Carolyn: <br /> <br />Pursuant to your request for itemization of design and build projects, I submit the <br />following breakdown of costs. <br /> <br />A. Design and field measurement is billed at $65.00 per hour and usually represents <br />about 5% - 8% of the final product cost. <br />B. Shop fabrication is billed at $45.00 per worker, per hour and normally requires a !Wo- <br />man crew to fabricate and paint the products. Material are normally about 30% _ 40% <br />of the product cost and shop labor constitutes about 40% - 50% of the product cost. <br />C. Field installation of the product usually represents about 10% of the cost and is billed <br />at $60.00 per hour with equipment and tool costs included. <br /> <br />I hope this answers your questions with this project. <br /> <br />S;cvs: <br />~ Lloyd <br /> <br />EX ;/.I8rT A <br /> <br />10<'1 <br /> <br />6cp'ON <br /> <br />[69cS~ ~ OJ OGNOH <br /> <br />S[:SI <br /> <br />....0/6c/[0 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.