My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2007-05-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
05/07/2007
>
FULL PACKET_2007-05-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:39:57 PM
Creation date
5/2/2007 12:58:20 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/7/2007
Destruction Year
2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
side of Building "A" and the west side of Building "B". These activities <br />must be screened from the adjacent railroad line by a solid wall or fence <br />or by plant material approved by the Planning Division. <br />10. All leasing and rental of equipment shall take place enclosed within <br />either Building "A" or Building "B" or behind building "A" and adjacent to <br />Building "B" as indicated in condition No. 9 above. <br />11. The height of materials stacked outdoors shall not exceed the height of <br />the screen wall/landscaping provided. <br />12. There shall be no backing of trucks from Fourth Street on to the site or <br />from the site on to Fourth Street. <br />13. The palm trees located at the southwest corner of Building "A" shall be <br />retained. <br />14. Bougainvillea shall be planted at eight foot intervals and irrigation shall <br />be provided at the base of Building "A" at the rear of the new receiving <br />area, south to the southwest corner of the building, to help reduce <br />graffiti. <br />15. Anew eight foot tall wrought iron fence shall be constructed along the <br />west property line running from the southwest corner of the new <br />receiving area to the southwest corner of Building "A". <br />16. New fencing shall match the existing wrought iron fencing material <br />established on the site. <br />17. The access gate located on Santa Fe Street shall be closed during the <br />hours which HD Supply is open to public customers. It may be open to <br />receive deliveries prior to the beginning of regular operating hours. <br />18. All employees shall park their vehicles on-site. <br />19. Conditions of the variance shall be reviewed by the Planning Division for <br />compliance 90 days, six months, 1 year and annually there after from <br />the date of Certificate of Occupancy for the project. <br />B. Police Department <br />1. The site occupant shall be responsible for maintaining the premises free <br />from graffiti, including the side of the buildings adjacent to the railroad <br />tracks. All graffiti shall be removed within 24 hours. <br />2. The business operator shall post "No Loitering/Trespass signs/placards <br />in the parking lot and on the building pursuant to California Penal Code <br />("CPC") section 602. It shall be the business operator's responsibility <br />to ensure that CPC section 602 is complied with at all times that the <br />premises is in operation. <br />Resolution No. 2007-016 <br />31 A-116 Page 6 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.