My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
65A - PRELIM ACTION PLAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
06/04/2007
>
65A - PRELIM ACTION PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:39:34 PM
Creation date
5/30/2007 2:40:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
65A
Date
6/4/2007
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Residential Street Repair Priorities <br />for Five Year Initial Investment <br />Cost in <br />Millions Comments <br />308 Total estimated backlog in local street repair. <br />_38 Industrial street repair (postpone and consider localized assessment district with <br />City sharing costs with property owners). <br />-44 Concrete street repair (postpone and only do localized repairs for now). <br />_85 Reduce total residential street reconstruction costs of $160 million by 55% thru <br />alternative treatments. <br />Reduce scope of miscellaneous concrete repair including sidewalk, curb and <br />-35 gutter of $64 million by 55%. Only do critical concrete repair work such as raised <br />sidewalk sections and curb problems that cause standing water and/or safety <br />hazards. <br />-12 Delete neighborhoods where significant improvements were made in past 6 <br />years. <br />+6 Include high profile streets, i.e. Plaza Drive, Susan Street, Eastwood, etc. <br />100 Grand total investment in our residential streets over the next 5 years. <br />ATTACHMENT <br />5/30/2007 <br />65A-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.