Laserfiche WebLink
Residential Street Repair Priorities <br />for Five Year Initial Investment <br />Cost in <br />Millions Comments <br />308 Total estimated backlog in local street repair. <br />_38 Industrial street repair (postpone and consider localized assessment district with <br />City sharing costs with property owners). <br />-44 Concrete street repair (postpone and only do localized repairs for now). <br />_85 Reduce total residential street reconstruction costs of $160 million by 55% thru <br />alternative treatments. <br />Reduce scope of miscellaneous concrete repair including sidewalk, curb and <br />-35 gutter of $64 million by 55%. Only do critical concrete repair work such as raised <br />sidewalk sections and curb problems that cause standing water and/or safety <br />hazards. <br />-12 Delete neighborhoods where significant improvements were made in past 6 <br />years. <br />+6 Include high profile streets, i.e. Plaza Drive, Susan Street, Eastwood, etc. <br />100 Grand total investment in our residential streets over the next 5 years. <br />ATTACHMENT <br />5/30/2007 <br />65A-7 <br />