Laserfiche WebLink
Exhibit 1 <br />CONTRACT CURRRENT <br />SITE ALLOWANCE SOV BUDGET <br />DEMOLITION, SHORING, EARTHWORK & GRADING $848,490 $257,878 <br />SITE UTILITIES $221,750 $245,800 <br />ASPHALT PAVING $108,378 $8,000 <br />LANDSCAPE, IRRIGATION $92,900 $750 <br />SITE CONCRETE $59,720 $0 <br />PARKING STRUCTURE <br />CRACK CONTROL ALLOWANCE $2,500 $0 <br />FIELD ENGINEERING $6,000 $0 <br />SECURITY FENCING OUTSIDE GARAGE FOOTPRINT EXCLUDED EXCLUDED <br />EXCAVATION & BACKFILL $58,233 $60,000 <br />PILES-DRIVEN/ POURED EXCLUDED EXCLUDED <br />SITE CONCRETE /STAIRS $33,000 $0 <br />PARKING LOT STRIPING I BUMPERS $7,500 $10,000 <br />REINFORCING STEEL & PT $500,614 $822,000 <br />BARRIER CABLE $25,475 $25,000 <br />CONCRETE FORM $1,440,708 $1,444,990 <br />MASONRY $72,908 $332,604 <br />STEEL MISCELLANEOUS $274,337 $177,923 <br />SHEE7 METAL $3,784 $7,000 <br />CAULKING & BGWP $7,642 $18,000 <br />METAL DOORS /FRAMES (HARDWARE $3,100 $10,000 <br />OVERHEAD DOORS $10,000 $60,000 <br />GLASS & GLAZING $7,200 $15,800 <br />LATH & PLASTER $39,278 $106,000 <br />CERAMIC TILE $4,200 $5,000 <br />PAINTING $17,840 $101,000 <br />SIGNS & GRAPHICS $3,200 $10,000 <br />TOILET PARTITIONS /ACCESSORIES NIA NIA <br />SPECIALTIES & EQUIPMENT N!A N/A <br />PARKING CONTROLS (ALLOWANCE) $30,000 $826,336 <br />ELEVATORS $58,539 $50,000 <br />FIRE SPRINKLER SYSTEM !EXTINGUISHERS $38,300 $54,000 <br />PLUMBING $86,170 $85,000 <br />HVAC $5,135 $5,000 <br />ELECTRICAL $164,478 $242,750 <br />FINAL CLEAN-UP $4,923 $24,196 <br />TEMP POWER $10,000 $10,000 <br />CONTINGENCY $200,000 $100,000 <br />SUBCONTRACTORS FEE & GENERAL CONDITIONS $356.089 $374.452 <br /> <br />NEW WORK <br />Page 1 <br />