My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ACCO ENGINEERED SYSTEMS, INC. 4 - 2007
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
ACCO ENGINEERED SYSTEMS, INC. 4 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 11:53:13 AM
Creation date
6/26/2007 11:01:12 AM
Metadata
Fields
Template:
Contracts
Company Name
ACCO ENGINEERED SYSTEMS
Contract #
A-2007-129
Agency
FINANCE & MANAGEMENT SERVICES
Council Approval Date
6/4/2007
Expiration Date
6/30/2008
Insurance Exp Date
10/1/2008
Destruction Year
2017
Notes
Amended by A-2008-027, -01, A-2008-174, A-2009-048, A-2009-064, A-2010-109
Document Relationships
ACCO ENGINEERED SYSTEMS, INC. 4A - 2008
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
ACCO ENGINEERED SYSTEMS, INC. 4B - 2008
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
ACCO ENGINEERED SYSTEMS, INC. 4C - 2008
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
ACCO ENGINEERED SYSTEMS, INC. 4D - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
ACCO ENGINEERED SYSTEMS, INC. 4E - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
ACCO ENGINEERED SYSTEMS, INC. 4F - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />chamber module with new nuts, pressure test at normal operating pressure and check <br />for leaks. Install new five collectors and connect to existing five. Reinstall existing <br />burner, piping and electrical. Start burner, test all controls for proper operation, and <br />put into service. Adjust burner for optimum efficiency. ( Located at the Police <br />Facility) <br />Price $ 4.980.00 <br />14, Perform a leak test on York chiller model YTHU3E2CRG. ( Located at the Police <br />Facility) <br />Price $ 910.00 <br />15. Replace filters and provide chiller controls coolant for (2) York chiller <br />YTHU3E2CRG. ( Located at the Police Facility) <br />Price $ 820.00 <br />16. Replace Copeland compressor model ERC10200-TAD-400 460 volts on evidence <br />freezer unit. Provide refrigerant as needed. ( Located at the Police Facility) <br />Price $ 2.960.00 <br />17. Annual Preventive Maintenance inspection of (3) evidence freezer models LAHA- <br />032E-TAD-100. 1. Inspect controls for operations, 2. Verify compressor operation <br />and refrigerant charge, and inspect for refrigerant leaks. Inspect electrical connections <br />and adjust as needed. ( Located at the Police Facility) <br />Price $ 1.260 00 <br />18. Annual inspection of (4) freezer model Kolpak AE66280B cold zone. ( Located at <br />the Police Facility) <br />Price $ 1.680.00 <br />I% Replace compressor on freezer Copland 2DA3060E-TFC100. Serial# <br />CT9517O4925S. ( Located at the Police Facility) <br />Price $ 3.870.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.