My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2007-07-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
07/02/2007
>
FULL PACKET_2007-07-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:38:57 PM
Creation date
6/27/2007 12:03:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
7/2/2007
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />JIILY 2, 2007 <br />TITLE: <br />CONTRACT AWARD FOR FLOWER STREET <br />REHABILITATION (PROJECT NOS. 06- <br />1710 AND 06-1006) <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />^ As Recommended <br />^ As Amended <br />^ Ordinance onlsaReading <br />^ Ordinance on 2 Reading <br />^ Implementing Resolution <br />^ Set Public Hearing For <br />CONTINUED TO <br />FILE NUMBER <br />1. Award a contract to R.J. Noble Company, the lowest responsible <br />bidder, in accordance with unit bid prices in the estimated amount of <br />$2,566,914.90, for construction of the Flower Street Rehabilitation <br />project from Edinger Avenue to First Street and Civic Center Drive to <br />Seventeenth Street. <br />2. Approve a Funding Analysis with a total estimated construction cost <br />of $3,168,900. <br />The segments of Flower Street from Edinger Avenue to First Street and <br />Civic Center Drive to Seventeenth Street have been identified as a high <br />priority on the City's Pavement Management System (Exhibit 1). The <br />pavement is deteriorating due to weather, age, and heavy usage. Some of <br />the adjacent curbs, gutters, sidewalks, and driveway approaches are also <br />in various state of disrepair. <br />The project provides for construction of new street pavement and <br />replacement of damaged concrete curbs, gutters, sidewalks, driveway <br />approaches, and installation of wheelchair ramps. Once completed, these <br />improvements will enhance the ride quality, surface drainage and visual <br />appearance of the street. Additionally, the existing In-Roadway Flashing <br />Crosswalk (IRFC) at the intersection of Flower and Walnut Streets will be <br />removed and replaced with the latest IRFC model. Once completed, the IRFC <br />installation will enhance the visibility and safety of the existing <br />marked crosswalk. <br />23A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.