My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
UNITED INSPECTION & TESTING 3 - 2000
Clerk
>
Contracts / Agreements
>
U
>
UNITED INSPECTION & TESTING 3 - 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2020 12:18:41 PM
Creation date
7/5/2007 8:11:16 AM
Metadata
Fields
Template:
Contracts
Company Name
United Inspection & Testing
Contract #
A-2000-064
Agency
Public Works
Insurance Exp Date
7/1/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br />t <br />t <br />t <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />} <br />. <br />~ <br />. <br />} <br />} <br />~ <br />. <br />~ <br />, <br />) <br />) <br />) <br />) <br />t <br />. <br />) <br />, <br />. <br />t <br />) <br />) <br />) <br /> <br />.. <br />~ <br /> <br />. <br />~ <br />fl <br /> <br />t <br /> <br />'-' <br /> <br />Statement of Qualifications <br />....,.I Inspection and Materials Testing <br /> <br />PROJECT SUMMARY/CLIENT REFERENCE <br /> <br />Project Name and Location: <br /> <br />Rancho Los Amiqos Medical Center. Downev, CA <br /> <br />JacQueline Perry Institute, Central Plant. ParkinQ Structure <br /> <br />Project Description (type of Construction, levels, etc.): This 150 - bed inpatient care facilitv is a 3 stOry <br /> <br />252,000 s.f. buildinq with a structural steel frame and an exterior of GFRC panels. The Central <br /> <br />Plant is a two stOry buildinq with a precast concrete panel exterior. The 27.422 square foot facilitv <br /> <br />has a 5,600 ton coolinQ capacity, 96.000 IbsJhr steam output, 4,000 kW emerQencv power and a <br /> <br />hvbrid plant with 2 staQe absorption as well as electric chillers. Built in conjunction with the $50 <br /> <br />million JacQueline Perry Institute, and Central Plant, the 5-level post tensioned parkinq structure <br /> <br />also houses the hospital's police station. <br /> <br />Scope of Services (type of inspection and/or testing): <br /> <br />United provided inspection of concrete, masonry, <br /> <br />fireproofinq, structural steel (shop and field), and GFRC panels. Also provided was complete <br /> <br />materials testinq reQuirements per construction documents. <br /> <br />Construction Amount: <br /> <br />S 70 Million <br /> <br />United's Contract: <br /> <br />$ 920,000 <br /> <br />Owner (Entity and Location): <br /> <br />LA Countv Department of Public Works <br /> <br />Contact Person: <br /> <br />Alvin Lee <br /> <br />(now with UCLA) <br /> <br />Phone: <br /> <br />310-794-5689 <br /> <br /> <br />F <br /> <br /> <br /> <br />'~,:t~ltf;jlll~1 <br /> <br />",~.-." ."~"-' ,.ti..:.t~..t."-,:;,;>,-,~""-,,,,,,. i <br />""",:".". '~~~~;~1 <br />: '''l~-' <br />III~...,-,~ <br />_ lb . IIJ~jl <br /> <br />--' .~-, , ,_~J""~_ <br />- - ~ - - ................,-~----._........-_.~~~_.. ---~-~~-~'-~ <br /> <br />UNITED <br />INSPECTION <br />!. TE~TJNG JNC <br />
The URL can be used to link to this page
Your browser does not support the video tag.