Laserfiche WebLink
Page 12 — Section F: Has the City been in contact with the recommended subcontractors for the ball <br />diamond maintenance firms referenced in the RFP? Are we limited to subcontract with just these two firms? <br />City staff chose the two firms based on past experience with these two highly qualified firms. Staff will <br />inform the two ball diamond maintenance firms that they have been recommended in the RFP, but <br />contractors are not required to subcontract with either firm. If an alternative subcontractor is chosen, the <br />contractor must be able to demonstrate their qualifications and past performance in this field <br />(prequalified). The same insurance requirements required by the Cityfor the contractor shall also apply to <br />the selected subcontractor. <br />Why doesn't the City subcontract directly with the two ball diamond maintenance firms? <br />We elected to incorporate this requirement into the agreement to facilitate the administration of the <br />multiple landscape contracts in the parks. <br />Page 13,14, & 15 — Optional Add -on Sites: Are contractors going to be required to bid on both optional add - <br />on sites? <br />Yes. It will help City staff in terms of budgeting. Please put down your best price. If your price includes <br />deviations, i.e., annual CPI increases, so state in the Deviations Section. <br />Page 18 — Item J: Does Santa Ana use reclaimed water at park sites? <br />Veryfew parks in the City have reclaimed water. <br />Page 19 — Item Ic: Is the requirement for contractor to plant new groundcover where needed inclusive in the <br />cost of the overall agreement? <br />Yes. This requirement is inclusive in the base bid. <br />When does the City intend to start the contract? <br />Contract effective date will be determined once the contract is awarded. The contract has to go to City <br />Council for approval first. Midori Gardens, the current contractor, will fill in the gap until the new <br />contract is in place. The City anticipates an August I" start-up date. <br />Page 19 - Item If- Does the City require mulch on the tree wells? <br />No. <br />Page 20 — Item 3b: Is an Irrigation Specialist required to perform irrigation checks? <br />Yes. These are engineered systems, and as such, the City is looking for a better maintenance process. <br />Successful contractor will need to show that they have qualified staff to maintain our irrigation systems. <br />Page 21— Item la: Will Dail mowers be required in open turf areas? <br />Yes. The City is open to proposals for large rotary mowers as an alternative; however, contractor will <br />need appropriate equipment to mow the parks. The City, however, will not accept the substitution of real <br />mowers on priority turf. <br />(Proposers may attach a separate sheet that identifies the type of mowers that they plan to provide.) <br />Page 25 — Item 2b: City may clarify this item to read: only in the areas designated by the Director. <br />Please acknowledge receipt of this addendum on your proposal. <br />ALL. OTHER TERMS, CONDITIONS, AND SPECIFICATIONS REMAIN <br />UNCHANGED. <br />Sincerely, <br />Bill O'Connor <br />