Laserfiche WebLink
City of Santa Ana <br />Chapter 4. Mitigation Monitoring Plan <br />Monitoring and Reporting Procedures <br />The MMP for the proposed project will be in place through all phases of the <br />project, including design, constmction, and operation. The City will be <br />responsible for administering the MMP and ensuring that all parties comply with <br />its provisions. The City may delegate monitoring activities to staff, consultants, <br />or contractors. The City will also ensure that monitoring is documented through <br />periodic reports and that deficiencies are promptly corrected. The designated <br />environmental monitor will track and document compliance with mitigation <br />measures, note any problems that may result, and take appropriate action to <br />rectify problems. <br />Mitigation Monitoring Plan Implementation <br />Table 4-1 lists, by resource area, each mitigation measure included in the draft <br />IS/MND. Certain inspections and reports may require preparation by qualified <br />individuals and these are specified as needed. The timing and method of <br />verification for each measure is also specified. <br />Initial Study/Mitigated Negative Declaration 4_2 <br />J&5 0296.07 <br />75D-92 <br />