Laserfiche WebLink
<br />RFP 07-044 <br />Control System: The control system will consist of both a wall mounted control panel and a <br />handheld infrared remote control. During presentations the user can either operate the <br />system with push buttons located on the wall mounted panel or have the flexibility of using <br />the handheld remote control. Both devices will operate the system and all of its functions <br />comparably. Control functions will include the following: <br />Two control system program changes (GUI) shall be included as part of the proposal. <br />System power on/off <br />Source selection (i.e. computer, DVD, VHS, Computer Transport controls of DVDNHS <br />Player <br />Volume control <br />Screen up/down <br />Inclusions: <br />The following work is to be included in the proposer scope of work: <br />• All conduits, high voltage wiring panels, breakers, relays, boxes, receptacles, etc. <br />• Concrete saw cutting and / or core drilling. <br />• Fire wall, ceiling, roof and floor penetration. <br />• Necessary sheet rock replacement and or repair. <br />• Necessary ceiling the or T-bar modifications, replacement and/or repair and all millwork <br />(moldings, trim, etc.). <br />• Painting and patching. <br />• Permits (unless specifically provided for elsewhere iri the contract). <br />• HVAC and plumbing relocation. <br />• As built drawings (both printed and electronic mediums) <br />Installation Requirements <br />The AudioNisual System Integrator shall provide aturn-key svstem that includes all structural, <br />electrical, conduits or plenum cable that is associated with the multimedia system. Installation <br />shall occur during regular business hours, Monday -Friday, 8 A.M to 5 P.M. provided it causes <br />minimum distractions to the Police Department working environment. The room shall be made <br />available to the System Integrator for a reasonable amount of time to complete the project. The <br />System Integrator shall assign a Project Manager and Project Engineer to the job, who will <br />remain the contacts through the duration of the project. The System Integrator shall submit a <br />project installation schedule (following award of contract) for approval and/or discussion with the <br />Santa Ana Police Department. It is expected that the System Integrator will install the project in <br />a consecutive time frame without any "down time" or labor gaps in the schedule. The highest <br />installation practices and standards (utilizing the ICIA installation standards) are expected and <br />shall be followed. These guidelines are minimum standards. Workmanship and system <br />functionality shall be closely examined prior to the Santa Ana Police Department approving <br />payment for the project. <br />10 <br />TROXELL COMMUNf~ATIONS, fNC <br />