Laserfiche WebLink
<br /><6Waf'.' <br /> <br />;;>t:; ,< " <br />;""1JWjt -.,:'. <br />~~~'},::ot ~ <br />"~:: c: www.iwater.org <br />,~ . <br /> <br />EXIllBIT A: <br /> <br />Project Deliverables and Compensation <br /> <br />GIS Conversion Services <br />Basic CAD to GIS Conversion and Database Design: <br />Data will be extracted and layered from the existing Microstation drawing, georeferenced to the <br />county basemap, converted to a geodatabase, and a topology algorithm will be run ([his will make <br />sure all of the layers such as pipes, valves, & hydrants are properly connected to each other). Fixing <br />dangles or gaps, as well as adding all documented hydrant and service laterals will also be performed. <br />All attributes will be properly linked and structured using the iWater infraMap data model. <br />$6,000 <br /> <br />GPS Data Collection: <br />Asset data will be captured out in the field using Trimble ProXRS sub-meter GPS equipment. <br />Technicians are Department of Heath certified grade D2 or higher. We will perform an inventory of <br />10,500 valves, Pipeline locations will be overlaid on top of the GPS points and connected manually. <br />All facility attributes will be documented and loaded directly into the geodatabase. To ensure <br />connectivity, a topology will also be run. <br />$7 per major asset: (7 * 10,500) = $73,500 <br />15% for pipeline digitization: (0.15 * $73,500) = $11,025 <br /> <br />System Support and Training: <br /> <br /> <br />iWater will remotely monitor, configure, and support all related IT infrastructure for the scope of this <br /> <br /> <br />project. Data backups will be automated and securely stored off-site. Technical support, <br /> <br /> <br />troubleshooting, and user training will also be performed. Maintenance and support will be billed on a <br /> <br /> <br />per month basis. <br /> <br />$500 per month: (24 * 500) = $12,000 <br /> <br />iWater, Inc. Confidential <br /> <br />A-1 <br /> <br />5/14/2007 <br /> <br />EXHIBIT A <br />