My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH SEWER SYSTEM
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
08/06/2007
>
75A - PH SEWER SYSTEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:38:26 PM
Creation date
8/1/2007 10:50:31 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
8/6/2007
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEWER SYSTEM MANAGEMENT PLAN <br />DEVELOPMENT PLAN AND SCHEDULE <br />Introduction <br />The City of Santa Ana has completed the Sewer System Management Plan (SSMP) Development <br />Plan and Schedule in accordance with the requirements of the Statewide General Waste <br />Discharge Requirements (WDR) for Sanitary Sewer Systems. Because the Santa Ana Regional <br />Water Quality Control Board (Region 8) issued a local Sewer WDR (Order No. R8-2002-0014) <br />to north Orange County, many of the required Plans and Programs of the General WDR have <br />already been developed and initiated or even completed in some cases. The existing SSMP <br />prepared in response to the Region 8 Board WDR will be revised and amended as required to <br />comply fully with the new Statewide WDR . <br />When completed, the SSMP will be recommended for adoption by the City Council. CiTy staff <br />will continually update the plan and bring it back to Council at intervals as specified in the WDR <br />for approval. <br />75A-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.