Laserfiche WebLink
<br />-EauiDment Readiness <br /> <br />AMX is a 24-hour a day, 365 day a year emergency response company, which is capable of responding around the <br />world. AMX must be ready for action at a moments notice for events that may occur. Our readiness for hazardous <br />material emergency response is solely dependant upon people that are employed by AMX. A minimum standard of <br />readiness for equipment and materials has been established and all employees are responsible for insuring that AMX <br />is ready. <br /> <br />AMX is a professional company, and the image of AMX needs to reflect that professionalism. There is nothing that <br />makes customers feel better about the job being completed in the proper manner than the image of a company that <br />takes pride in its own equipment and appearance. Therefore certain criteria have been set for equipment. <br /> <br />Company Vehicles <br /> <br />The first images that a customer sees upon the arrival to a scene are the vehicles AMX drives. All company vehicles <br />will have the company logo and appropriate numbers affixed to the vehicle. After each completed job (or when <br />necessary) all company vehicles will be cleaned inside and out. <br /> <br />Emergency Response Trucks Equipment List <br /> <br />Emergency response trucks are trucks that respond directly to the scene for assessment of the site. Each of these <br />trucks needs to be equipped with equipment for that purpose, and to start the documentation process. The following <br />is a list ofthe minimum equipment needed in each of the emergency response trucks. <br /> <br />Truck Inventory <br />and <br /> <br /> <br /> <br />Amount <br />6 <br />6 <br />6 <br />6 <br />3 <br />10 <br />6 <br />6 <br />2 <br />6 <br />1 <br />6 <br /> <br />Emergency Response Trailers <br /> <br />The emergency response trailers provide the standard materials and equipment used on the majority of emergency <br />responses. These trailers need to be stocked with this minimum equipment to ensure the readiness of our company. <br />Each trailer should be able to respond and support most emergency responses. The trailers will need to be restocked <br />if the job is very large, but the initial response should be supported from the trailer. All trailers need to be clean <br />inside and out after each project and need to be maintained in an orderly fashion during a response. This enables <br />personnel to quickly gather supplies and equipment for any situation. A minimum list of equipment and supplies <br />has been established for all AMX emergency response trailers. Inventory of the trailer should be taken as needed, <br />but no less than once a week. <br /> <br />37 <br />