Laserfiche WebLink
<br />10 RL Duct Tape <br />8 Ea Traffic Cones <br />200 Ft Ext. Cord <br />4 Ea Flash Lights <br />1 Ea Generator <br />1 Ea Drum Dolly <br />1 Ea PluQ and Patch Kit <br /> <br /> <br />. Amount <br />6 <br />6 <br />6 <br />6 <br />3 <br />10 <br />6 <br />6 <br />2 <br />6 <br />1 <br /> <br />Descri tion <br />Current Work Tickets <br />S ecial Work Tickets <br />Contract and Work Orders <br />Current Rate Sheet <br />Note Pads <br />Pens, Pencils, Markers <br />Strai ht Bills of Ladin <br />Waste Manifests <br />Dis osable Camera <br />Chan e Orders <br />Current Company Pager <br />List <br />Chain of Custod <br /> <br />6 <br /> <br />Ea <br /> <br />Emergency Response Transfer Trailer <br /> <br />1 Ea 2.5" Nozzle <br />20 Gal AFFF Foam <br />2 Ea Foam Eductor <br /> <br /> <br />Amount <br />6 <br />6 <br />6 <br />6 <br />6 <br />6 <br /> <br />Emergency Response Transfer Trailer is a very specialized unit. The trailer is equipped with everything needed for <br />transfers of high-pressure gases and liquids. The equipment contained in the trailer needs to be maintained and <br />ready for a response. The equipment and associated materials need to be checked and inspected for damage and <br />operation. The following is an inventory and maintenance schedule for the Emergency Response Transfer Trailer. <br /> <br />Insert Trailer Inventorv <br /> <br />Transfer Trailer Preventive Maintenance Schedule <br /> <br />Equipment Operational Maintenance Inspected Certified <br /> Check <br />Corken Pump Weekly Quarterly Weekly Annually <br />Corken Weekly Quarterly Weekly Annually <br />Compressor <br />High Pressure Gas Weekly Quarterly Weekly Annually <br />Hose <br />Low Pressure Weekly Quarterly Weekly Annually <br />Hose <br /> <br />40 <br />