Laserfiche WebLink
r. 0 • <br />AUTO MALL IMPROVEMENTS <br />Santa Ana Auto Mall <br />Santa Ana, CA <br />Exhibit A - Schedule of Values and Qualifications 4/26/2007 <br />Division <br />Work Item Description <br />Value Notes <br />DIVISION 1 - <br />GENERAL REQUIREMENTS <br />- a a qua <br />a ;ARX ;" „ <br />1000 <br />General Conditions <br />..'y ,� „ <br />General Conditions <br />27,264 <br />Traffic Control (Plan/Implementation) <br />4.800 <br />1400 <br />Quality Control <br />............................................ <br />Special Inspections / Materials Testing <br />Excluded - by Owner <br />1500x <br />Survey and Staking <br />Site Improvements <br />Not Required <br />DIVISION 2 - SITE WORK <br />�'•` # �� <br />2100x <br />Erosion Control / SWPPP <br />Dust Control / Inlet Protection / Misc SWPPP <br />2,500 <br />2050/220012300/2310 <br />Demolition / Earthwork <br />Demolition / Earthwork / Grading <br />10.625 <br />2751 <br />Site Concrete <br />.......................................... <br />Curbs / Banding <br />3,074 <br />2700x <br />Fence / Gates <br />........................................... <br />............................................ <br />Fence / Gates <br />18,564 <br />.......... <br />2850x <br />Interlocking Pavers <br />............................... <br />Paver Repairs / Fill-ins <br />1,250 <br />2900 <br />Irrigation and Landscaping <br />Irrigation / Landscaping ! Maintenance <br />37,300 <br />DIVISION 7 - THERMAL & MOISTURE <br />Iq <br />7900 <br />Sealants and Caulking <br />Miscellaneous Caulking <br />625 <br />DIVISION 9 - FINISHES, <br />9900 <br />Painting / Coatings <br />Miscellaneous Painting <br />8,800 <br />DIVISION 10 - SPECIALTIES <br />10400 <br />Signage <br />Signs <br />95,785 <br />Dispose of excess Excavated Materials <br />1,250 <br />DIVISION 16 - ELECTRICAL <br />16300x <br />Site Lighting <br />Sign Lighting <br />18,266 <br />MISCELLANEOUS <br />90000x Other / Miscellaneous <br />Program Manager's Contingency <br />Insurance 1,681 <br />Builders All -Risk Insurance Excluded -Provided by Owner as necessary <br />Program Manager 14,508 <br />Performance & Payment Bonds 3,113 <br />TOTAL $259,424 <br />Qualifications <br />1. Our Proposal excludes costs associated with Permits, Fees, Assessments and Permanent Metering. <br />2. Our Proposal excludes costs associated with Removal and Disposal of Hazardous Materials, Buried Debris, <br />Cesspools, Buried Tanks and Utilities not indicated for removal or relocation. <br />3. Our Proposal excludes costs associated with Design and Engineering. <br />4. Our Proposal excludes costs associated with Site Lighting Repairs or Renovations. <br />Included are costs associated with New Site Lighting at Signage locations only. <br />5. Our Proposal excludes costs associated with Testing and Inspections. <br />6. Our Proposal excludes costs of Water Useage during Construction. <br />7. Our Proposal excludes costs associated with Builder's All -Risk Insurance. <br />8. Our Proposal includes costs for Prevailing Wages associated with the Signage only. <br />All other work will be performed as non-prevailing ra qn tdeemed as maintenance <br />