My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - BROADWAY REHAB
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
09/04/2007
>
23A - BROADWAY REHAB
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:37:51 PM
Creation date
8/28/2007 4:47:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
23A
Date
9/4/2007
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />REQUEST FOR <br />COUNCIL ACTION <br /> <br /> <br />CITY COUNCIL MEETING DATE: <br />SEPTEMBER 4, 2007 <br />TITLE: <br /> <br />CLERK OF COUNCIL USE ONLY: <br /> <br />APPROVED <br /> <br />CONTRACT AMENDMENT FOR <br />BROADWAY REHABILITATION AND <br />WATER MAIN IMPROVEMENTS <br />(PROJECTS 05-1705 AND 06- <br />3199) <br /> <br />o As Recommended <br />D As Amended <br />D Ordinance on 1 sl Reading <br />o Ordinance on 2nd Reading <br />o Implementing Resolution <br />o Set Public Hearing For <br /> <br />~ <br /> <br />a~12-- <br /> <br />CI Y MANAGER <br /> <br />CONTINUED TO <br /> <br />FILE NUMBER <br /> <br />RECOMMENDED ACTION <br /> <br />Amend the contract with All American Asphalt for the Broadway <br />Rehabilitation and Water Main Improvements Project to increase the amount <br />by $185,000 for a total estimated amount of $1,834,443. <br /> <br />DISCUSSION <br /> <br />On June 19, 2006, the City Council awarded a contract for the Broadway <br />Rehabilitation and Water Main Improvements Project to All American <br />Asphalt in the estimated amount of $1,499,494 plus a ten percent <br />contingency totaling $1,649,443. Due to lack of accurate as-built <br />information, the existing asphalt pavement was found to be thicker than <br />expected and the existing underground utilities were at different <br />locations different than those shown in the old records. As a result, <br />actual quantities of excavation, asphalt concrete and some other related <br />work items are higher than the engineer's estimate. <br /> <br />In addition, the contractor spent more time and effort to protect or <br />relocate the existing utilities in order to install the water main. <br />Given these circumstances, staff recommends an increase in the contract <br />with All American Asphalt by an estimated amount of $185,000 to cover the <br />additional costs. <br /> <br />FISCAL IMPACT <br /> <br />The estimated increase of the contract is $185,000 for a total estimated <br />amount of $1,834,443. Funds are available in the Measure M Street <br /> <br />23A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.