My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PBS&J 2 - 2007
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
PBS&J 2 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2016 1:11:56 PM
Creation date
9/12/2007 9:15:09 AM
Metadata
Fields
Template:
Contracts
Company Name
PBS&J
Contract #
A-2007-185
Agency
PUBLIC WORKS
Council Approval Date
8/6/2007
Insurance Exp Date
4/1/2013
Destruction Year
2020
Notes
Amended by A-2007-185, A-2010-005
Document Relationships
PBS&J 2A - 2008
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PBS&J 2B - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />Leighton Consulting, Inc, <br />A LEIGHTON GROUP COMPANY <br />2007 PROFESSIONAL FEE SCHEDULE* <br />FOR PREVAILING WAGE PROJECTS <br />PROFESSIONAL SERVICES <br />Technical Staff Hourly Rate <br />Laborer ** ................................................................................................................................................. ............................... $95 <br />Soil /Field Technician`* ............................................................................................................................. ............................... 110 <br />Staff Engineer/Geologist/Scientist/Field Supervisor ................................................................................. ............................... 115 <br />Senior Staff Engineer /Geologist/ Scientist .................................................................... ............................... ............................131 <br />Operations Manager /Equipment Operator ................................................................... ............................... ............................152 <br />Project Engineer /Geologist/Scientist ........................................................................... ............................... ............................152 <br />Senior Project Engineer /Geologist/ Scientist ................................................................ ............................... ............................168 <br />Associate..................................................................................................................... ............................... ............................189 <br />Principal..................................::................................................................:.......:.....:.:.. :..::.......................... ............................ 205 <br />SeniorPrincipal ......................:.................................................................................... ............................... ............................247 <br />Technical Support Staff ` .' <br />AdministrativeAssistant/Word Processor ........................... <br />CAD Operator/Technical Illustrator /GIS Specialist .............. <br />Engineering Equipment <br />Hourly Rate <br />..................................................................... ............................... $74 <br />......................................... ............................... ............................105 <br />Unit Rates <br />VehicleUsage .........................:..................................................................................................... ............................$11 per hour <br />Tiltmeter, Inclinometer Units ........................................................................... ............................... ............................200 per day <br />NuclearSoil Gauge ........................................................................................................................ .............................84 per day <br />GPSStation .................................................................................................... ............................... ............................168 per day <br />OtherEquipment .................................................................................................................... ............................... Upon Request <br />OTHER TERMS AND CONDITIONS <br />• Overtime for field personnel (all technician and staff levels) will be charged at 1.5 times basic hourly rate listed above. <br />• Expert witness testimony will be•charged at 2.0 times the above rates, with a minimum charge of four hours per day. <br />• Invoices are rendered monthly, payable upon receipt. <br />• Proposals are valid for 30 days; unless otherwise stated in the proposal. <br />• Heavy equipment, subcontractor fees and expenses, supplemental insurance, travel, shipping, reproduction, and other reimbursable <br />expenses will be invoiced at cost plus 20 %, unless billed directly to, and paid by client. <br />• Client agrees to provide all information in Client's possession about actual or possible presence of buried utilities and hazardous <br />materials on the site, and agrees to reimburse Leighton Consulting for all costs related to their unanticipated discovery. <br />These rates are predicated.on standard insurance coverage and a limit of liability to our fees for the project. <br />• For "paid when paid" contracted work, Leighton Consulting shall receive payment within 10 calendar days from when our Client <br />receives payment for our services. <br />Minimum Hourly Charges for Field Technicians: <br />1. Monday- Friday ......................................................................................................................... ..............................2 hours minimum <br />2. Saturday and Sunday .............................................................................................................. ..............................4 hours minimum <br />Effective through December 31, 2007, after which remaining work will be billed at then - current rates. <br />** Subject to change based upon project advertised date. <br />9060 302 <br />1 -07 -P <br />17781 Cowan ■ Irvine, CA 92614 <br />949.250.1421 ■ Fax 949.250.1114 ■www.leightonconsulting.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.