Laserfiche WebLink
FUNDING ANALYSIS <br />PROJECT NOS. 06-1009,06-1010,06-1011 AND 07-3205 <br />MAIN STREET REHABILITATION; WALKIE WAY TO NORTH CITY LIMITS, 8TH STREET <br />TO 18TH STREET; COLUMBINE TO SUNFLOWER; 8TH TO WASHINTION AND MAIN STREET <br />WATER MAIN FROM 8TH STREET TO WASHINGTION <br />Construction Contract $1,989,989 <br />Contract Administration 69,300 <br />Inspection and Testing 128,700 <br />Survey Staking 99,113 <br />Contingencies 198,998 <br />TOTAL ESTIMATED CONSTRUCTION COSTS $2,486,100 <br />EXHIBIT 2 <br />23A-4 <br />