My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - 3321 SOUTH FAIRVIEW ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
10/01/2007
>
75B - 3321 SOUTH FAIRVIEW ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:37:41 PM
Creation date
9/26/2007 1:45:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
10/1/2007
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- ~ - Environmental Checklist <br />For CEQA Compliance <br /> Less Than <br /> Significant <br /> Potentially with Less Than <br /> Significant Mitigation Significant No <br />Issues & Supporting Information Sources Impact Incorporated Impact Impact <br />XIV. Recreation <br />A. Would the project increase the use of existing ^ ® ^ ^ <br />neighborhood and regional parks or other <br />recreational facilities such that substantial physical <br />deterioration of the facility would occur or be <br />accelerated. <br />B. Does the project include recreational facilities or ^ ^ ® ^ <br />require the construction or expansion of <br />recreational facilities which might have an adverse <br />physical effect on the environment? <br />XV. Transportation /Traffic <br />A. Cause an increase in traffic which is substantial in ^ ^ ® ^ <br />relation to the existing traffic load and capacity of <br />the street system (i.e. result in a substantial <br />increase in either the number of vehicle trips, the <br />volume to capacity ration on roads, or congestion <br />at intersections?) <br />B. Exceed, either individually or cumulatively, a level ^ ^ ^ <br />of service standard established by the county <br />congestion management agency for designated <br />roads or highways? <br />C. Result in a change in air traffic patterns, including ^ ^ ^ <br />either an increase in traffic levels or a change in <br />location that results in substantial safety risks? <br />D. Substantially increase hazards to a design feature ^ ^ ® ^ <br />(e.g. sharp curves or dangerous intersections) or <br />incompatible uses (e.g. farm equipment)? <br />E. Result in inadequate emergency access? ^ ^ ® ^ <br />F. Result in inadequate parking capacity? ^ ^ ^ <br />Alton Court August 2007 <br />Initial Study/Mitigated Negative Declaration 5.12 <br /> J&S 00635.07 <br />75B-76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.