My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2007-10-01
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
10/01/2007
>
FULL PACKET_2007-10-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:37:20 PM
Creation date
9/26/2007 2:08:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
10/1/2007
Destruction Year
2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />OCTOBER 1, 2007 <br />TITLE: <br />CONTRACT AWARD FOR MAIN STREET <br />REHABILITATION; WALKIL WAY TO NORTH <br />CITY LIMITS, 8~ STREET TO 18xx <br />STREET, COLUMBINE TO SUNFLOWER; <br />MAIN STREET WATER MAIN FROM 8Tx TO <br />WASHINTION(PROJECT NOS. 06-1009,06- <br />1010,06-1011 AND 07-3205) <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />^ As Recommended <br />^ As Amended <br />^ Ordinance on 1 S' Reading <br />^ Ordinance on 2"d Reading <br />^ Implementing Resolution <br />^ Set Public Hearing For_ <br />CONTINUED TO <br />FILE NUMBER <br />1. Award a contract to All American Asphalt, the lowest responsible <br />bidder, in accordance with unit bid prices in the estimated amount of <br />$1,989,989 for construction of Main Street Rehabilitation and Water <br />Main. <br />2. Approve a Funding Analysis with a total estimated construction cost <br />of $2,486,100. <br />DISCUSSION <br />The segments of Main Street from Walkie Way to North City Limit, Stn <br />Street to 18th Street, and Columbine to Sunflower Avenue have been <br />identified as a high priority on the City's Pavement Management System <br />(Exhibit 1). The pavement is deteriorating due to weather, age and heavy <br />usage. Some of the adjacent curbs, gutters, sidewalks and driveway <br />approaches are also in various states of disrepair and require <br />replacement. <br />This project provides for construction of new street pavement, and <br />replacement of damaged concrete curbs and gutters. This project will <br />also replace deteriorated and undersized water facilities. <br />The Notice Inviting Bids was advertised on August 1 and 3, 2007, and bids <br />were opened on August 30, 2007. A summary of the bid invitations mailed, <br />the bids received, and the bid results follow. <br />23A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.