My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MESTRE GREVE ASSOCIATES
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
M-N (INACTIVE)
>
MESTRE GREVE ASSOCIATES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 1:04:47 PM
Creation date
10/4/2007 8:25:41 AM
Metadata
Fields
Template:
Contracts
Company Name
MESTRE GREVE ASSOCIATES
Contract #
A-2007-161
Agency
PLANNING & BUILDING
Council Approval Date
6/18/2007
Expiration Date
6/30/2008
Insurance Exp Date
9/20/2008
Destruction Year
2014
Notes
Amended by A-2008-125
Document Relationships
MESTRE GREVE ASSOCIATES 1A
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\M-N (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for West End Lofts <br />Page 2 <br />sensitive receptors. The application of the City of Santa Ana Noise Ordinance to control <br />construction noise will be discussed. <br />The noise impacts associated with the project's traffic on adjacent land uses will be assessed in <br />terms of the CNEL noise scale. The project would not be expected to generate enough traffic to <br />affect noise levels on nearby arterial roadways. Potential traffic noise level increases will be <br />calculated, presented, and compared to standard significance thresholds. <br />Traffic noise levels that impact the project site will also be assessed for compatibility with the <br />proposed land uses. Noise levels within the project area will be determined and compared to <br />noise/land compatibility guidelines contained in the City Santa Ana Noise Element and/or the <br />State Compatibility Guidelines. <br />Noise measurements at the site will be used to estimate noise levels at the proposed project. <br />Noise levels will be compared to the City's Noise Ordinance standards to determine <br />significance. <br />Mitigation Measures. Strategies will be identified for the control of noise levels within the <br />project site. <br />Cost. We propose to do this study on a fixed fee basis of $3,000 for the noise assessment. Our <br />hourly rates are $180 for Principal Engineers, $90 for staff engineers, and $65 for technicians. <br />If this proposal is acceptable to you, please sign on the line below and return the letter to our <br />office (via fax is acceptable). The signed letter will serve as a binding contract for our services <br />and once we have received the signed letter (or your verbal approval) we will initiate the work. <br />Sincerely, <br />Mestre Greve Associates <br />Fred Greve, P.E. <br />Principal <br />FG/bv <br />Urban West <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.