My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INTERVAL HOUSE 10 - 2007
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
INTERVAL HOUSE 10 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2017 10:32:26 AM
Creation date
10/8/2007 2:57:39 PM
Metadata
Fields
Template:
Contracts
Company Name
INTERVAL HOUSE
Contract #
A-2007-091
Agency
COMMUNITY DEVELOPMENT
Council Approval Date
4/16/2007
Expiration Date
6/30/2008
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Reducing Lead Hazards In The Home <br /> <br />Removing <br />lead <br />improperly <br />can increase <br />the hazard to <br />your family <br />by spreading <br />even more <br />lead dust <br />around the <br />house. <br /> <br />Always use a <br />professional who <br />is trained to <br />remove lead <br />hazards safely. <br /> <br /> <br />8 <br /> <br />In addition to day-to-day cleaning and good <br />nutrition: <br /> <br />. You can temporarily reduce lead hazards <br />by taking actions such as repairing dam- <br />aged painted surfaces and planting grass <br />to cover soil with high lead levels. These <br />actions (called "interim controls") are not <br />permanent solutions and will need ongo- <br />ing attention. <br /> <br />. To permanently remove lead hazards, <br />you should hire a certified lead "abate- <br />ment" contractor. Abatement (or perma- <br />nent hazard elimination) methods <br />include removing, sealing, or enclosing <br />lead-based paint with special materials. <br />Just painting over the hazard with regular <br />paint is not permanent removal. <br /> <br />Always hire a person with special training <br />for correcting lead problems-someone <br />who knows how to do this work safely and <br />has the proper equipment to clean up <br />thoroughly. Certified contractors will employ <br />qualified workers and follow strict safety <br />rules as set by their state or by the federal <br />government. <br /> <br />Once the work is completed, dust cleanup <br />activities must be repeated until testing <br />indicates that lead dust levels are below the <br />following: <br /> <br />. 40 micrograms per square foot (J.1g1ft1) <br />for floors, including carpeted floors; <br /> <br />. 250 /lg/ft1 for interior windows sills; and <br /> <br />. 400 /lglft1 for window troughs. <br /> <br />Call your state or local agency (see bottom <br />of page t t) for help in locating certified <br />professionals in your area and to see if <br />financial assistance is available. <br /> <br />IAttachment 11 Page of 161 <br />
The URL can be used to link to this page
Your browser does not support the video tag.