My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EIP AND ASSOCIATES 7
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
E-F (INACTIVE)
>
EIP AND ASSOCIATES 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 4:29:26 PM
Creation date
10/25/2007 9:48:51 AM
Metadata
Fields
Template:
Contracts
Company Name
EIP AND ASSOCIATES
Contract #
A-2007-156
Agency
PLANNING & BUILDING
Council Approval Date
6/18/2007
Expiration Date
6/30/2008
Insurance Exp Date
9/30/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.4 Determine the number and types of water service connections associated with <br />the proposed project, as well as the additional demand generated within the <br />City's local service area, and allocate water demand to various types of service <br />connections. <br />1.5 Carry the demand analysis out for a projected twenty-year period in 5 -year <br />increments beginning in 2005 through 2030, and present this information in a <br />tabular format. <br />1.6 Conduct an assessment of the potential demand versus the available supplies as <br />identified in the above tasks and present this information in the form of a <br />technical report. <br />Products: Administrative Draft <br />➢ 1 electronic copy of the Administrative Draft WSA <br />Task 2- Prepare Draft and Final Water Supply Assessment <br />2.1 Based on one consolidated set of comments from reviewers, EIP will incorporate any <br />corrections and/or modifications and prepare a Draft version of the WSA. It is assumed <br />that any comments on the Draft version will be editorial and no new analysis will be <br />required. Based on one consolidated set of comments from the City staff on the Draft, <br />EIP will prepare the Draft WSA and draft findings for delivery to City staff for review. <br />Products <br />1 electronic copy (PDF) of the Draft WSA and findings <br />➢ 3 copies of the Draft WSA <br />1 electronic copy (PDF) of the Draft WSA <br />2.2 Based on one consolidated set of final comments from City staff, EIP will incorporate any <br />corrections and modifications and prepare a Final WSA for review prior to publication. It <br />is assumed that any comments on the Final WSA will be editorial and no new analysis <br />will be required. Based on one consolidated set of comments from the City, EIP will <br />prepare the Final WSA. <br />The Final WSA will be provided to the City for adoption. It is expected that the <br />information contained in the draft WSA will also be available for use in the CEQA review <br />process and the Final WSA will be appended to the DEIR. <br />Products <br />1 electronic copy (PDF) of the Final WSA and findings <br />➢ 10 copies of the Final WSA <br />1 electronic copy (PDF) copy of the Final WSA <br />Schedule <br />• Project Kickoff: Week 1 <br />• Task 1: Prepare Draft WSA Week 10 <br />• Task 2: Prepare Final Draft WSA Week 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.