My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH 3321 SOUTH FAIRVIEW ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
11/05/2007
>
75A - PH 3321 SOUTH FAIRVIEW ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:36:56 PM
Creation date
10/31/2007 11:31:05 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
11/5/2007
Destruction Year
2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The project proposes a driveway access along Alton Avenue approximately 246 feet east of Fairview <br />Street, measured from centerline to centerline. The proximity of the driveway to Fairview Street would <br />not adversely affect the operation of the driveway access, or operation at the intersection of Fairview <br />Street and Alton Avenue. Drivers will be able to enter and exit the project driveway access to/from the <br />east and west safely based on existing plus project traffic volumes. <br />• There is adequate sight distance for incoming and outgoing vehicles to/from the project site. <br />• The intersection of the project driveway and Alton Avenue would not adversely affect queuing in the <br />westbound left-turn pocket at Fairview Street and Alton Avenue. In addition, westbound left-turn queue <br />at the intersection of Alton/Fairview is not expected to extend to the project driveway intersection. <br />Manning Homes will include a statement in the development's CC&R's, which will inform homeowners <br />that the City may revisit and re-evaluate the intersection of the project driveway and Alton Avenue at a <br />future time, potentially resulting in driveway access modifications and implementation of any <br />improvements as necessary. <br />Traffic Analysis for - l8 - October, 2007 <br />Alton Court Residential Development <br />75A-149 <br />
The URL can be used to link to this page
Your browser does not support the video tag.