My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, CITY OF (MAIN STREET IMPROVEMENRTS) - 2007
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, CITY OF (MAIN STREET IMPROVEMENRTS) - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:28:37 PM
Creation date
11/8/2007 1:16:10 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, CITY OF ORANGE
Contract #
A-2007-230
Agency
Public Works
Council Approval Date
10/1/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />for the PROJECT; and is authorized to hire and confer with all consulting <br />engineers and contractors relative to the materials testing, site construction <br />survey, construction engineering, construction management, and construction <br />for the total PROJECT in accordance with standard construction practices. <br /> <br />d. SANTA ANA shall have the exclusive right of approval of all plans, <br />specifications and cost estimates prepared by consultants for the portion of the <br />PROJECT within the jurisdictional boundaries of SANTA ANA. <br /> <br />e. All progress payments for the PROJECT shall be reviewed by SANTA ANA. <br />All work within SANTA ANA shall be per Santa Ana standard plans. <br /> <br />f. SANTA ANA shall cause all hired consultants on the PROJECT to obtain <br />general liability and motor vehicle liability insurance in amounts satisfactory <br />to ORANGE. For any consultant contract on the PROJECT entered into for <br />this "Agreement", SANTA ANA shall also cause ORANGE to be named as <br />additionally insured on insurance certificates and separate endorsements for <br />all consultant contracts related to the PROJECT. Copies of such certificates <br />and endorsements shall be provided to ORANGE prior to consultants <br />proceeding with work on the PROJECT. <br /> <br />g. SANTA ANA shall advertise and award all contracts for the PROJECT in <br />accordance with federal, state and local laws. <br /> <br />h. SANTA ANA shall, in advance, notify ORANGE as to the official advertising <br />dates, bid opening date, and construction start date, and request ORANGE to <br />attend all pertinent meetings, i.e. pre-bid, pre-construction, site, and final walk <br />through. <br /> <br />1. SANTA ANA shall provide ORANGE final Record Drawings for the <br />PROJECT within 120 days of the completion and acceptance of construction. <br /> <br />2. ORANGE Rights and Duties: <br /> <br />a. Change orders for work within ORANGE must receive the written approval of <br />the Executive Director of the Public Works Agency of ORANGE prior to <br />implementation, which approval shall not be umeasonably withheld. <br />ORANGE shall have oversight inspection review within ORANGE <br />jurisdictional boundaries and shall be notified of the progress of the <br />PROJECT for such purposes. ORANGE shall also have the right to enter and <br />inspect within SANTA ANA boundaries at all times for the purposes of <br />overseeing SANTA ANA lead agency functions. <br /> <br />b. ORANGE shall have the exclusive right of approval of all plans, <br />specifications and cost estimates prepared by consultants for the portion of the <br />PROJECT within the jurisdictional boundaries of ORANGE. <br /> <br />2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.