Laserfiche WebLink
<br />for the PROJECT; and is authorized to hire and confer with all consulting <br />engineers and contractors relative to the materials testing, site construction <br />survey, construction engineering, construction management, and construction <br />for the total PROJECT in accordance with standard construction practices. <br /> <br />d. SANTA ANA shall have the exclusive right of approval of all plans, <br />specifications and cost estimates prepared by consultants for the portion of the <br />PROJECT within the jurisdictional boundaries of SANTA ANA. <br /> <br />e. All progress payments for the PROJECT shall be reviewed by SANTA ANA. <br />All work within SANTA ANA shall be per Santa Ana standard plans. <br /> <br />f. SANTA ANA shall cause all hired consultants on the PROJECT to obtain <br />general liability and motor vehicle liability insurance in amounts satisfactory <br />to ORANGE. For any consultant contract on the PROJECT entered into for <br />this "Agreement", SANTA ANA shall also cause ORANGE to be named as <br />additionally insured on insurance certificates and separate endorsements for <br />all consultant contracts related to the PROJECT. Copies of such certificates <br />and endorsements shall be provided to ORANGE prior to consultants <br />proceeding with work on the PROJECT. <br /> <br />g. SANTA ANA shall advertise and award all contracts for the PROJECT in <br />accordance with federal, state and local laws. <br /> <br />h. SANTA ANA shall, in advance, notify ORANGE as to the official advertising <br />dates, bid opening date, and construction start date, and request ORANGE to <br />attend all pertinent meetings, i.e. pre-bid, pre-construction, site, and final walk <br />through. <br /> <br />1. SANTA ANA shall provide ORANGE final Record Drawings for the <br />PROJECT within 120 days of the completion and acceptance of construction. <br /> <br />2. ORANGE Rights and Duties: <br /> <br />a. Change orders for work within ORANGE must receive the written approval of <br />the Executive Director of the Public Works Agency of ORANGE prior to <br />implementation, which approval shall not be umeasonably withheld. <br />ORANGE shall have oversight inspection review within ORANGE <br />jurisdictional boundaries and shall be notified of the progress of the <br />PROJECT for such purposes. ORANGE shall also have the right to enter and <br />inspect within SANTA ANA boundaries at all times for the purposes of <br />overseeing SANTA ANA lead agency functions. <br /> <br />b. ORANGE shall have the exclusive right of approval of all plans, <br />specifications and cost estimates prepared by consultants for the portion of the <br />PROJECT within the jurisdictional boundaries of ORANGE. <br /> <br />2 <br /> <br />