Laserfiche WebLink
Parsons 407 8 Street <br />BAnckerhor/ Suite 1450 <br />-_ San Diego, CA 92107 <br />_ 679-338-9376 <br />-f00 <br />YERflS <br />November 8, 2007 <br />Mr. Dave Biondolillo <br />City of Santa Ana <br />Transportation & Traffic Engineering <br />Public Works Agency M-931 <br />20 Civic Center Plaza <br />Santa Ana, CA 92702 <br />Dear Dave: <br />RE: Proposed Amendment No. 2 to Contract No. A-2007-035 <br />Phase B -Santa Ana Transit Vision and Go Local Project Concept Study <br />I have enclosed the revised work scope and cost proposal for Phase B Amendment <br />No. 2 of the Santa Ana Transit Vision and Go Local Project Concept Study. If you <br />concur with the enclosures, this study title and work scope would supersede the OCTA <br />Go Local Program -Step 1 study title and work scope and, along with the cost proposal, <br />would constitute Amendment No. 2 to the agreement executed between the City of <br />Santa Ana and PB on January 17, 2006 (Amendment No. 1 was executed on February <br />5, 2007). <br />The $279,189 proposed contract amendment generally breaks down as follows: <br />27% =Preparation of the OCTA Go Local Final Concept Report and OCTA Go Local <br />Step 2 Application and initiation of the Final Study Report <br />51 % = Photosimulations and Aerial Tour Video <br />22% =Completion of the Final Study Report and Project Activities/Project Management <br />during the additional four months of the contract (March -June 2008) <br />We have been undertaking work in accordance with the amended work scope per your <br />direction at our August 1, 2007 Progress Meeting and subsequent meetings since <br />August 1, 2007. This out-of-scope work has been billed to the existing contract budget <br />pending formal execution of a contract amendment that incorporates the amended work <br />Over a Century o/ <br />Engineering Excellence <br />The total contract budget amendment requested is $279,189 and would extend the <br />project contract schedule four months through June 30, 2008. The overall contract <br />budget summary is: <br />