Laserfiche WebLink
<br />, . <br /> <br />\ <br /> <br />O. <br /> <br />DAVIS-BACON WAGE COMPLIANCE MONITORING <br /> <br />For each project, a fee of 1/2 of 1% of the to::al project <br />amount with a minimum fee of $2,350.00 Fee will be invoiced <br />in the following manner: at the beginning oE construction, <br />1/2 of Eee; at construction midway point, remaining 1/2 of <br />fee. Invoices payable upon receipt. Fee may also be added <br />to projects as a soft cost and deducted from escrow, at the <br />Agency's dissretion. <br /> <br />Employee site interviews are for monthly site Jisics up to the <br />following ma~imums: <br /> <br />a. for a p~oject $0 - $149,999, a maximum of G months <br /> <br />b. for a project $150,000 - $649,999, a ma~imum of 12 <br />months <br /> <br />c. for projects $650,000 and over, a maximum of 18 <br />17lonths <br /> <br />Each addi tiona 1 inspection, if requested, wi 11 be $ 200.00 <br />each. <br /> <br />The fee stated is for standard disbursement projects. <br />Projects involving section 17 Rental Rehab, section 312, or <br />HOME funds wi 11 require the additional cash management service <br />fee which should be added to the stated Davis-Bacon fee. <br /> <br />For technical consultation services, <br />hour. <br /> <br />I/SD - <br />a fee of $100.00 per <br /> <br />P. <br /> <br />TECHNICAL CONSULTATION <br /> <br />Q. MORTGAGE ASSISTANCE APPLICATION UNDERWRITING <br /> <br />1) Underwri tinq Agency direct deferred loans (per loan): <br />$285.00. <br /> <br />Loan cancellation fees will be 1/2 of the above fees pluS <br />outside costs if loan is cancelled prior to delivery of <br />full underwriting analysis to Agency. <br /> <br />2) Loan Document preparation: $150.00 pluS outside costs. <br /> <br />Cancellation fees: $37.50 if outside services are <br />ordered without the preparation of loan documents; $75.00 <br />if loan documents are prepared and loan is cancelled. <br />