My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - STATE ROUTE 55
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
01/07/2008
>
25H - STATE ROUTE 55
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:34:47 PM
Creation date
1/1/2008 11:38:19 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25H
Date
1/7/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
District Agreement No. 12-568 <br />ATTACHMENT 1 <br />SCOPE OF WORK <br />This Scope of Work outlines the specific areas of responsibility for various PROJECT <br />development activities for the proposed widening of the on-ramps from Eastbound <br />MacArthur Boulevard to State Route 55. <br />1. CITY and STATE concur that the proposal is a Category 4B as defined in STATE's <br />Project Development Procedures Manual. <br />2. CITY will submit drafts of investigative studies and technical environmental reports <br />and individual sections of the draft environmental documents to STATE, as they are <br />developed, for review and comment and concurrence. Traffic counts and projections <br />to be used in the various reports shall be supplied by STATE if available, or by <br />CITY. Existing traffic data shall be furnished by CITY. <br />3. STATE will review, monitor, and concur and, if applicable, approve all PROJECT <br />development reports, studies, and plans, and provide all necessary IQA activities up <br />to but not including advertising of PROJECT. <br />4. The existing freeway agreement need not be revised. <br />5. All phases of PROJECT, from inception through construction, whether done by <br />CITY or STATE, will be developed in accordance with all policies, procedures, <br />practices, and standards that STATE would normally follow. <br />6. Detailed steps in the PROJECT development process are attached to this Scope of <br />Work as Attachments 2, 3, and 4. These Attachments are intended as a guide to <br />STATE's and CITY's staff. If there are any conflicts between the Scope of Work, <br />Attachments 2, 3, and 4, and the-terms of the Agreement, the terms of the Agreement <br />shall control. <br />13 <br />25H-15 <br />