My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25J - SANTA ANA REGIONAL TRANSP CTR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
01/07/2008
>
25J - SANTA ANA REGIONAL TRANSP CTR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:34:49 PM
Creation date
1/1/2008 11:38:20 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25J
Date
1/7/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement No. 75A0242 <br />Attachment I <br />Project Description <br />The proposed project is located at 1000 East Santa Ana Boulevard at the Santa Ana <br />Regional Transit Center (SARTC) in the City of Santa Ana. The project entails <br />construction of a block wall and the installation of color imprinted art panels onto the <br />wall. The block wall has two main functions: 1) to serve as a visual barrier to the Orange <br />County maintenance facility for train patrons and others using the station facility, and 2) <br />serve as the mounting wall for the art panels. The wall will be 1000 feet long, and 10 feet <br />high. The images to be imprinted on the panels will be selected by a local arts <br />committee. <br />Initially, this project was to be constructed in tandem with the platform reconstruction as <br />part of the Pedestrian Bridge project at the SARTC. Avery specific time window was <br />built into the overall project schedule for this coordinated effort to occur, but events <br />precluded the Art Wall from being constructed during this timeframe. <br />The Art Wall will now be constructed upon completion of the Pedestrian Bridge (July <br />2006). This post-platform construction of the Art Wall will necessitate working within a <br />limited physical space (8' to 10'), and will require the use of lighter duty equipment. <br />This will add both time and cost to the original budget of the project. <br />25J-31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.