My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25J - SANTA ANA REGIONAL TRANSP CTR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
01/07/2008
>
25J - SANTA ANA REGIONAL TRANSP CTR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:34:49 PM
Creation date
1/1/2008 11:38:20 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25J
Date
1/7/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana Depot Aesthetic Improvements <br />Scope of Work <br />The scope of this project includes the aesthetic upgrade of various. components to the <br />Santa Ana Depot. Improvements including repair of the stucco in various locations <br />around the Depot building, along the colonnades and pilasters of the perimeter wrought <br />iron fencing along Santa Ana Blvd. and Santiago St. Another targeted improvement <br />would be the replacement of the balustrade of the staircase on the south side of the <br />courtyard as well as along the southern viewing deck at the top of this staircase. <br />Installation of new paladian windows along the northern and eastern elevations of the <br />event room on the north side of the building are also proposed. <br />Estimate <br />ITEM DESGRIPTIOI~F UNIT UANTITY -UNIT PRICE ~ - COST <br />1 Balustrade R lacement LS 1 $69,000.00. $ 69,000.00 <br />2 Buildin Paintin & Stucco Re air LS 1 $116,185.00 $ 116,185.00 <br /> $ 185.181.00 <br />10% Desi n En ineerin $ 18,519.00 <br />15% Construction En ineerin $ 27,777.00 <br />10% ContinQenc $ 18,519.00 <br /> TOTAL $ 210,000.00 <br />Schedule <br /> Balustrade Replacement 110 days i <br />- <br /> <br />2 <br />Design . <br />35 days <br />3 Construction 30 da s <br />4 <br /> <br />5 ._ ~_ _ _ _ _.W~_~ _ ._.~__ .. <br />Building Painting 8 Stucco Repair <br />_. . . _ . _.__ <br />~ 134 days <br />6 Design 35 days <br /> <br />7 _ <br />Construction __ <br />54 days <br />25J-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.