Laserfiche WebLink
.~. ~ 1 r <br />Basis of Rates <br />Work from 0-4 hours Bill 4 hours <br />Work from 4-8 hours Bill 8 hours <br />Work over 8 hours Bill 1.5 (Time) <br />Work over 12 hours Bill 2.0 (Time) <br />Saturdays 0 - 8 hours Bill 1.5 (Time} <br />Saturdays 8 -12 Bill 2.0 (Time) <br />Sundays Bill 2.0 (Time) <br />Holidays Bill 3.0 (Time) <br />(Holidays consist of New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and the day <br />after and Christmas Day) <br />Night Shift Hourly Rate + $ 5.00/hour <br />Show-up time (No work performed) Bill 2 hours <br />Fabrication Shop Inspection: Inspectors dispatched to shops further than 50 miles from the project location shall <br />incur travel time at $48/hr and mileage at $0.40 per mile. Shops further than 100 miles from the project location may <br />incur subsistence, travel time and mileage charges. <br />Soils Technicians: Soils Technicians transporting nucl ear gauges shall incur travel time at $30/hr and mileage at <br />$0.40 per mile. <br />Administration Services <br />Administrative Drafting hourly $ 55.00 <br />Administrative Charge each $ 55.00 <br />Admin. Clerical, Data Entry, Compilation, Reporting hourly $ 45.00 <br />Outside Services hourly Cost +25% <br />Other Fees and Hourly Charges <br />Certificate of Insurance <br />Additional Insured (if required) <br />Final Affidavits (1-20 Reports) <br />Final Affidavits (21 + Reports) <br />Mileage <br />Parking Fees & Tolls <br />Subsistence <br />Travel Time Deputy Inspectors <br />Trip Charge <br />per mile <br />per day <br />hourly <br />each <br />No Charge <br />No Charge <br />$ 200.00 <br />$ 400.00 <br />0.40 <br />At Cost <br />Cost +20% <br />$ 48.00 <br />$ 48.00 <br />13 <br />25K-69 <br />