My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - 2100 W ALTON
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
01/07/2008
>
31A - 2100 W ALTON
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:34:56 PM
Creation date
1/1/2008 11:38:26 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31A
Date
1/7/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. <br />• <br />t t <br />" '~~ Environmental Che~~list <br />For CEQA Compliance <br /> Potentially <br /> Significant <br /> Potentially Unless Less Than <br /> <br />Issues & Supporting Information Sources Significant <br />Impact Mitigation <br />Incorporated Significant <br />Impact No <br />Impact <br />B. Exceed, either individually or cumulatively, a level ^ ^ ~ ^ <br /> of service standard established by the county <br /> congestion management agency for designated <br /> roads or highways? <br />C. Result in a change in air traffic patterns, including ^ ^ ~ ^ <br /> either an increase in traffic levels or a change in <br /> location that results in substantial safety risks? <br />D. Substantially increase hazards to a design feature ^ ^ ~ ^ <br /> (e.g. sharp curves or dangerous intersections) or <br /> incompatible uses (e.g. farm equipment)? <br />E. Result in inadequate emergency access? ^ ^ ~ ^ <br />F. Result in inadequate parking capacity? ^ ^ ~ ^ <br />G. Conflict with adopted policies supporting alternative ^ ^ ~ ^ <br /> transportation (e.g. bus turnouts, bicycle racks)? <br />XVI. Utilities and Service Systems <br />A. Exceed wastewater treatment requirements of the <br /> applicable Regional Water Quality Control Board? <br />B. Require or result in the construction of new water <br /> or wastewater treatment facilities or expansion of <br /> existing facilities, the construction of which could <br /> cause significant environmental effects? <br />C. Require or result in the construction of new storm <br /> water drainage facilities or expansion of existing <br /> facilities, the construction of which could cause <br /> significant environmental effects? <br />D. Are sufficient water supplies available to serve the <br /> project from existing entitlements and resources or <br /> are new or expanded entitlements needed? <br />E. Result in the determination by the wastewater <br />• treatment provider which serves or may serve the <br /> project that it has adequate capacity to serve the <br /> project's projected demand in addition to the <br /> provider's existing commitments? <br />mdlmswordlenvcheck.doc11.15.99 <br />31~~4~~ <br />^ ^ ~' ^ <br />^ ^ ,~ ^ <br />^ ^ ~ ^ <br />^ ~' ^ ^ <br />^ ^ ~' ^ <br />Page 9 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.